Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 2, 2025 at 8:00 PM
Updated July 4, 2025
Demolition, site work, renovation and addition to a water / sewer project in Sneads Ferry, North Carolina. Completed plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.
The Design-Builder will work with ONWASA and their Owner’s Advisor (HDR) to determine the needed improvements, final layout, sizing, and specific facilities to meet the goals of ONWASA for this project. The Design-Builder will provide the resources and staff to deliver the final project that will include, but not be limited to: a. Implement a robust safety program for all design and construction related activities. b. Implement the “Onslow Water and Sewer Authority Guidelines for Recruitment and Selection of Minority Businesses for Participation in Authority Construction Contracts” policy. c. Deliver quality assurance and quality control of design and construction related activities. d. Lead interactive design workshops with ONWASA and HDR, Owner’s Advisor. e. Complete all preliminary and final design engineering efforts for the project with design document submittals at 30%, 60%, and 100%. f. Implement a project controls strategy that keeps ONWASA and HDR informed of all project components. g. Develop an initial opinion of cost with submittal at the 30% design stage, updated cost at 60% design stage and GMP(s). An updated cost opinion should be maintained throughout the Phase 1 effort in a format acceptable to ONWASA. h. Develop alternatives analysis including capital and life-cycle costs to assist ONWASA in making key decisions. i. Complete all surveying and geotechnical engineering required for successful design, construction and development of construction pricing. j. Work with ONWASA and HDR to finalize all permitting activities and obtain permits required for project construction. k. Develop and maintain a project risk register with costs in a format acceptable to ONWASA. l. Provide all necessary project management, documentation, and progress reporting as required for a successful project. m. Implement an “Open-Book” and transparent progressive design-build process. n. Work collaboratively with the ONWASA’s operations, maintenance, and management team to provide key information to make decisions. o. Provide engineering services during construction to include RFIs, shop drawing reviews, contractor change order requests, factory witness equipment testing observation and reports, preparation of record drawings, and project management support. p. Construction management services. q. Lead start-up, performance testing, and any necessary training of ONWASA staff in successful operation of the Treatment Plant. r. Complete project close-out activities including final punch-lists, operations and maintenance manual production, training, project certifications, documentation for asset management, and warranty efforts. Last Day for Questions June 23, 2025, by 5:00 pm
Post-Bid
Water / Sewer
$3,000,000.00
Public - County
Addition, Demolition, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 3, 2025
March 3, 2026
1095 State Hwy 210, Sneads Ferry, NC
Related To This Project
Sneads Ferry, NC
Bid Date: Nov 20 2025
Sneads Ferry, NC
Bid Date: Dec 05 2025
Sneads Ferry, NC
Bid Date: Jul 17 2024
Sneads Ferry, NC
Bid Date: May 10 2024
Sneads Ferry, NC
Bid Date: May 17 2024
Sneads Ferry, NC
Bid Date: Apr 29 2024
Sneads Ferry, NC
Bid Date: Feb 02 2024
Sneads Ferry, NC
Bid Date: Jan 31 2024
Sneads Ferry, NC
Bid Date: Jan 22 2024
Sneads Ferry, NC
Bid Date: Nov 21 2023
Sneads Ferry, NC
Bid Date: Feb 17 2022
Sneads Ferry, NC
Bid Date: Sep 26 2023
Sneads Ferry, NC
Bid Date: Sep 08 2023
Sneads Ferry, NC
Bid Date: Jun 16 2023
Sneads Ferry, NC
Bid Date: Dec 18 2018
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
