Black Friday through Cyber Monday: Get 10% off Project Intelligence

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 30, 2025 at 8:00 PM

Updated July 31, 2025

Site work and new construction of a mixed-use development in Pocatello, Idaho. Completed plans call for the construction of a playground / park / athletic field; for site work for a playground / park / athletic field; and water / sewer project.

**As of July 23 ,2025, this project has not yet been awarded. A timeline for the award has not yet been established.** The City of Pocatello has secured funding for a public facility project for the Ross Park Bathroom located at approximately 2610 S. 2nd Avenue, Pocatello, Idaho 83204 and the Optimist Park bathroom, located at 7th Ave. and E.Young St. Pocatello, ID 83201. The project will comprise site clearance, site preparation, and installation of single stall ADA-accessible bathroom facility. The project will include connection to City water and sewer. The bidder must be a licensed public works contractor. The project requires a 1-year workmanship and at least a 1-year product warranty. It is the intent of these documents to describe the work required to complete this project in sufficient detail to secure comparable bids. All parts or work not specifically mentioned which are necessary in order to provide a complete installation shall be included in the bid and shall conform to all Local, State, and Federal requirements including but not limited to Davis-Bacon wages. Davis-Bacon wage rates are included in the bid package documents and wage rates should be reflected in the total bid price.All bids in excess of $150,000 shall be accompanied by a guarantee equal to at least five percent (5%) of the bid amount.This guarantee may be in the form of a bond, certified check or other negotiable instrument. Bid bonds will be accompanied by power of attorney bearing the same date as the bond. City of Pocatello reserves the right to reject any or all bids, waive any nonmaterial irregularities in the bids received, and to accept the proposal deemed most advantageous to the best interest of the City of Pocatello. Morco Construction-Bid amount option c-$118,143.00

Award

Playgrounds / Parks / Athletic Fields

$118,143.00

Public - City

New Construction, Site Work

12

4

13

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
18
Bidding Soon
209
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 7, 2025

July 24, 2025

Project location map

Multiple Locations, Pocatello, ID

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed