Renovation of a detention facility in McKinney, Texas. Completed plans call for the renovation of a detention facility.
**As of September 26, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** The County is seeking sealed proposals from General Contractors capable of replacing the facade of the Collin County Juvenile Detention Center Addition. The opinion of probable construction cost for this contract is one hundred and fifty thousand ($150,000.00). SCOPE OF WORK INCLUDES all materials, labor, equipment, tools, machinery, facilities, and services to produce or be incorporated in such construction. The Contract will be a general contract to replace the facade at Collin County Juvenile Detention Center located at 4700 Community Boulevard Road McKinney, Texas 75071. Question/Substitution Request Deadline:July 3, 2025, 2:00pm Any interpretations, corrections and/or changes to an Invitation for Bid and related Specifications or extensions to the opening/receipt date will be made by addenda to the respective document by the Collin County Purchasing Department. Questions and/or clarification requests must be submitted no later than the date specified in the solicitation. BID SECURITY: All Bidders must submit, prior to the bid opening time, a Certified Check, Cashier's Check or acceptable Bid Bond payable without recourse to Collin County in the amount of not less than five percent (5%) of the total bid plus alternates as submitted. Bid Bond, certified check or Cashier's Check may be mailed or hand delivered to the Office of the Collin County Purchasing Agent, Collin County Administration Building, 2300 Bloomdale Road, Ste 3160, McKinney, TX 75071 and shall be delivered in an envelope, marked plainly on the outside with the Bid Name and Number. Regardless of delivery method, all Bid Bonds shall be received prior to the bid opening time to be considered. Failure to submit a copy of bid security prior to bid opening shall be cause for rejection of bid. The original Bid Bond shall be received in the Collin County Purchasing Department no later than close of business on the third working day after the bid opening. Late receipt of or failure to submit original Bid Bond shall be cause for rejection of bid. Contractor must furnish a performance bond, payment bond within ten (10) consecutive calendar days following award of contract. The bonds shall be issued by a corporate surety in accordance with all Texas Law, including but not limited to, Chapter 2253 of the Texas Government Code and Chapter 3503 of the Texas Insurance Code, for public works projects. 1.08 QUALIFICATION OF BIDDERS Within seven (7) consecutive calendar days following bid opening, the apparent low bidder shall submit with a properly executed Contractor's Qualification Statement as evidence to establish bidder's financial responsibility, experience and possession of such equipment as may be needed to prosecute the work in an expeditious, safe and satisfactory manner. This Statement shall include: List of current projects. List of projects completed within the past five years. Experience of key individuals of the organization. Trade and Bank references. A recent financial statement to confirm that the bidder has suitable financial status to meet obligations incidental to performing the work. Audited financial statements are not mandatory. Unaudited financial statements will be accepted. If bidder's firm does, however, have audited statements, please include a copy with your bid. A statement of cost for each major item of Work included in the Bid. A designation of the Work to be performed by the Bidder with his/her own forces. A list of names of the Subcontractors or other persons or organizations (including those who are to furnish materials or equipment fabricated to a special design) proposed for each portion of the Work. The Bidder will be required to establish to the satisfaction of the Engineerand Owner the reliability and responsibility of the proposed Subcontractors. Prior to the award of the Contract, the Engineerwill notify the Bidder in writing if either the County or the Engineer, after due investigation, has reasonable and substantial objection to any person or organization on such lists. If Owner or Engineer has a reasonable and substantial objection to any person or organization on such list, and refuses in writing to accept such person or organization, the Bidder may, at his/her option, withdraw his/her Bid without forfeiture of Bid Security or provide an acceptable substitute. Subcontractors and other persons and organizations proposed by the Bidder and accepted by Owner and Engineermust be used on the Work for which they were proposed and accepted, and shall not be changed except with the written approval of Owner and the Engineer. Bidders may be disqualified and their bids not considered for any of the following specific reasons: Reason for believing collusion exists among bidders. The bidder being interested in any litigation against Owner. The bidder being in arrears on any existing contract or having defaulted on a previous contract. Lack of competency as revealed by the financial statement, experience and equipment, questionnaires, or qualification statement. Uncompleted work which in the judgment of Owner will prevent or hinder the prompt completion of additional work if awarded. Minimum Standards For Responsible Prospective Bidders: A prospective Bidder must meet the following minimum requirements. Collin County may request representation and other information sufficient to determine Bidder's ability to meet these minimum standards listed below. Have adequate financial resources, or the ability to obtain such resources as required; be able to comply with the required or proposed delivery/ completion schedule; have a satisfactory record of performance; have a satisfactory record of integrity and ethics; and be otherwise qualified and eligible to receive an award. In determining to whom to award the contract, the Owner may consider; the purchase price; the reputation of the bidder/contractor/vendor and of the bidder/contractor/vendor's goods or services; the quality of the bidder/contractor/vendor's goods or services; the extent to which the goods or services meet the Owner's needs; the bidder/contractor/vendor's past relationship with the Owner; the total long-term cost to the Owner to acquire the bidder/contractor/vendor's goods or services; and any other relevant factors specifically listed in the Instruction to Bidders. The Contractor shall post with Owner, not later than ten (10) consecutive calendar days of Collin County Commissioners Court award of Contract, a Performance Bond in the amount of one hundred percent (100%) of the total contract price in such form as is satisfactory to Owner, in compliance with Chapter 2253 of the Texas Government Code and all other applicable Texas Law, and on the form specified in the Contract Documents. This bond shall be executed by a corporate surety company duly authorized and admitted to do business in the State of Texas and licensed to issue such a bond in the State of Texas. The Contractor shall notify its corporate surety of any Contract changes. The Contractor shall post with Owner, not later than ten (10) consecutive calendar days of Collin County Commissioners Court award of Contract, a Payment Bond in the amount of one hundred percent (100%) of the total contract price in such form as is satisfactory to Owner, in compliance with Chapter 2253 of the Texas Government Code and all other applicable Texas Law, and on the form specified in the Contract Documents. This bond shall be executed by a corporate surety company duly authorized and admitted to do business in the State of Texas and licensed to issue such a bond in the State of Texas. The Contractor shall notify its corporate surety of any Contract changes. The Contractor shall post with Owner, not later than ten (10) consecutive calendar days of Collin County Commissioners Court award of Contract, a two (2) year Maintenance Bond in the amount of ten percent (10%) of the total contract price in such form as is satisfactory to Owner, in compliance with Chapter 2253 of the Texas Government Code and all other applicable Texas Law, and on the form specified in the Contract Documents. This bond shall be executed by a corporate surety company duly authorized and admitted to do business in the State of Texas and licensed to issue such a bond in the State of Texas. The Contractor shall notify its corporate surety of any Contract changes. The Contractor must demonstrate to Owner that it can secure the required performance and payment bonds, issued by a corporate surety company authorized and admitted to do business in the State of Texas and licensed to issue such a bond in the State of Texas. Contractor must also demonstrate that the bond is not in excess of ten percent (10%) of the corporate surety company's capital and surplus. To the extent the amount of the bond exceeds ten percent (10%) of the corporate surety company's capital and surplus, such bond will not be accepted unless bidder provides written certification that the corporate surety company has reinsured the portion of the risk that exceeds ten percent (10%) of the corporate surety company's capital and surplus with one or more insurers who are duly authorized, accredited or trusted to do business in the State of Texas. The amount reinsured by any reinsurer must not exceed ten percent (10%) of the reinsurer's capital and surplus. The Contractor must file with the performance bond and payment bond, all documents and information necessary to establish that the agent signing the bond is authorized to write the bond in the amount requested, and if applicable, that reinsurance requirements, have been met, including limits and ratings or other evidence of company solvency. If the corporate surety company on any bond furnished by Contractor to Owner is declared bankrupt or becomes insolvent or such corporate surety company's right to do business in the State of Texas is revoked, the Contractor shall within five (5) consecutive calendar days thereafter substitute another bond and corporate surety company, both of which shall be acceptable to Owner. 1.15 REJECTION OF BID The bidder acknowledges the right of Owner to reject any or all bids and to waive any informality or irregularity in any bid received. In addition, the bidder recognizes the right of Owner to reject a bid if the bidder failed to furnish any required Bid Security, or to submit the data required by the Bidding Documents, or if the bid is in any way incomplete or irregular. 1.17 EXECUTION OF CONTRACT The person or persons, partnership, company, firm, association or corporation to whom a contract is awarded shall within ten (10) consecutive calendar days after such award, sign the necessary contract agreements and submit the required bonds entering into the required Contract with Owner. No contract shall be binding on Owner until it has been executed by Owner or his/her duly authorized representative, and delivered to the Contractor. 1.18 FAILURE TO EXECUTE CONTRACT The failure of the Bidder to execute the required bonds or to sign the required Contract within ten (10) consecutive calendar days after the Contract is awarded, shall be considered by Owner as abandonment of his/her Bid, and Owner may annul the award, at the Owner's sole discretion.
Bid Results
Jails / Prisons
$198,933.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 31, 2025
September 1, 2025
4700 Community Ave, McKinney, TX
Related To This Project
McKinney, TX
--
McKinney, TX
Bid Date: Jul 03 2025
McKinney, TX
--
McKinney, TX
--
McKinney, TX
--
McKinney, TX
--
McKinney, TX
--
McKinney, TX
Bid Date: Jul 17 2025
McKinney, TX
--
McKinney, TX
--
McKinney, TX
Bid Date: Jul 01 2025
McKinney, TX
Bid Date: Jul 03 2025
McKinney, TX
Bid Date: Aug 13 2025
McKinney, TX
Bid Date: Aug 13 2025
McKinney, TX
Bid Date: Jun 19 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.