BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 5, 2025 at 8:00 PM

Updated August 6, 2025

Renovation of a multi-residential development in Mont Belvieu, Texas. Completed plans call for the renovation of a multi-residential development.

As of August 5, 2025, project was awarded to Sammons Construction, awarded amount is $80,582.20. Brickyard MDU Project Location: 12820 Langston Blvd Mont Belvieu Texas The deadline to ask questions is 6/20/2025 10:00 AM CST The project involves the construction of Phase One of Brickyard MDU Project. The project includes the interior placement of micro-duct and fiber from designated D-Marc termination boxes located in each building's meter room to individual On-Q panels located in each unit's master bedroom closet. Total Buildings: 14 residential buildings + 1 leasing office o Total Linear Feet: 43,895 feet of micro-duct and fiber optic cable o Installation Endpoints: o Start Point: D-Marc box (17in x 20in x 12in) in each building's meter room o End Point: On-Q panel in master bedroom closet of each unit o Slack Loop: 5-foot slack loop at each On-Q panel and in each D-Marc location Material Installation o Install 43,895 feet of micro-duct and fiber optic cabling throughout all buildings. o Mount a 17" x 20" x 12" D-Marc box in the meter room of each of the 14 residential buildings and the leasing office (15 total). o Route micro-duct and fiber from each D-Marc location (between floors on levels one and two and attic/crawl space on third levels) to the On-Q panel in every residential unit. Fiber Termination and Splicing o Splice and terminate fiber optic cables at both ends: o Inside the D-Marc box. o Inside the unit's On-Q panel. o Ensure clean, secure, and labeled splice trays or connectors at both ends. o Fiber optic splice loss no greater than 0.3 db. Testing and Labeling o Test all fiber runs end-to-end using industry-standard optical time-domain reflectometer (OTDR) and power meter/light source methods. o Tag and label each fiber at both termination points (On-Q and D-Marc). o Provide test results for all fiber runs for documentation and acceptance. Fiber Slack Management o Leave a 5-foot slack loop of fiber at each unit's On-Q panel. o Leave a 5-foot slack loop of fiber inside each D-Marc box in the meter rooms.

Award

Multi-Residential

$80,582.00

Public - City

Renovation

13

5

5

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
394
Active Projects
230
Bidding Soon
3,593
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 26, 2025

July 28, 2025

Project location map

12820 Langston Dr, Mont Belvieu, TX


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.