Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 5, 2025 at 8:00 PM

Updated August 6, 2025

Site work and paving for a mixed-use development in Williams charter Township, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

As of August 05, 2025, the project was awarded to Ace-Saginaw Paving Company, with an awarded amount of $4282,549.10. Description: The Project consists of completing local road improvements by crushing and shaping the existing roadway, and HMA Paving. 14,100 Sq. Yds. Crushing and Shaping Existing Bituminous Surface 1,175 Sq. Yds. 1'-0" Wide MDOT 23A Crushed Limestone Shoulder 2,550 Tons HMA, 4EL 395 Sq. Yds. Pavement Removal 1 Lump Sum Pavement Markings Est. Completion Date: Nov. 3, 2025 A. Calcium Chloride Application: 1. Must be used during the HMA Base Crushing and Shaping process to control dust and contribute to a more tightly compacted subgrade. 2. Liquid calcium chloride must be sprayed over the material at a rate of 0.50 gallons per square yard (or as directed by the Engineer) at the concentration defined for 38% calcium chloride concentration. 3. The final surface must receive a second application of liquid calcium chloride to seal the surface at a rate of 0.25 gallons per square yard (or as directed by the Engineer) at a concentration of 38% calcium chloride.

Award

Roads / Highways

$282,549.00

Public - City

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
208
Active Projects
113
Bidding Soon
1,409
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 17, 2025

August 18, 2025

Project location map

Wilder Rd, Williams charter Township, MI

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed