BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 8, 2025 at 8:00 PM

Updated August 9, 2025

Site work and new construction of a fire / police facility in Holden, Alberta. Completed plans call for the construction of a 6,000-square-foot, two-story above grade fire / police facility; and for site work for a fire / police facility.

Beaver Emergency Services Commission is soliciting Request for Proposal (RFP) for the supply and construction of a 50ft by 120ft Fire Station structure in the Village of Holden. The building will be built on a grade beam with a hydronic in slab heated floor, using 2x8 wood frame construction with metal exterior, interior and roof. There will be provision made within the electrical system design for on-roof solar installation in the near future, to meet the eligibility rules for grant funding. A 3" water spigot will be provided in the mechanical system design to allow for in-house apparatus refill. The administration and combined meeting and training area will be situated in the 30ft by 50ft second story area at the east end of the building and will be served by a separate H-Vac system to avoid the transmission of diesel smoke into those areas. Question Deadline 07/08/2025 at 12:00 PM MT

Award

Fire / Police

$1,951,474.00

Public - State/Provincial

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
28
Bidding Soon
447
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 11, 2025

November 1, 2025

Project location map

4921 49 Ave, Holden, AB

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.