Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 6, 2026 at 7:00 PM
Updated February 7, 2026
Demolition, site work, new construction, renovation and addition to a mixed-use development in Miami, Florida. Completed plans call for the addition of a medical facility; for the demolition of a medical facility; for the construction of a medical facility; for the renovation of a medical facility; and for site work for a medical facility.
Solicitation 36C24825R0079 In accordance with 38 U.S.C. 8127 (Public Law 109-461), this procurement is set aside for SDVOSBs utilizing a tiered set-aside evaluation approach, including other than small businesses. Questions shall be submitted by the prime contractor through email to the Point of Contact listed above. No questions by telephone will be accepted. The cutoff for submission of questions is 11:00 AM ET on Wednesday, January 07, 2026. The question email's subject line must include "VA SOLICITATION NO. 36C24825R0079 Bid Build Project: 546-22-110 - Construct a New Boiler Building and Controls & Expand/Move Graphic Control." The Magnitude of Construction is, according to VAAR 836.204 (j), between $20,000,000.00 and $50,000,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. pn-RDCJP21006, 36C24823Q0741 The objective of this project is to renovate and upgrade the existing steam generation and its associated auxiliary systems in the Boiler Plant, Utility Building 44, located at the (MVAHCS). This includes constructing a new Boiler Plant and a new extension to the existing utility building, a Boiler Control Room adjacent to Building 44 with three (3) new 400-horsepower (HP) Boilers. The contractor shall furnish and install two (2) 400 HP Rental, stand-alone, Dual Fuel, (Natural Gas/Oil) Mobile, Temporary Boilers and a Boiler Control Room to always supply and maintain the Hospital Steam Load during construction as per the 100% construction drawings, narrative, addendums, Physical Security & Resiliency Design Manual (PSRDM), and specifications provided. The rental shall be provided on a monthly basis until the project is completed and accepted by the Government. The Contractor shall, in accordance with the 100% Design, Narrative, Addendum, and Specifications, prepare the site for building operations, including demolition and removal of existing structures, furnish labor and materials, and complete all tasks as per this SOW. All work shall be coordinated with the project CORs. A cost-loaded schedule shall be provided after the issuance of the Notice to Proceed (NTP) and before the commencement of work. Small Business 17.5.0% Veteran Owned Small Business 7.0% Service-Disabled Veteran-Owned Small Business 5.0% Small Disadvantaged Businesses (includes Section 8(a)) 5.0% Woman-Owned Small Business 5.0% Historically Underutilized Business (HUB) Zone Small Business 3.0%
Post-Bid
Medical
$50,000,000.00
Public - Federal
Addition, Demolition, New Construction, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 4, 2026
April 6, 2026
1201 NW 16th St, Miami, FL
Related To This Project
Miami, FL
Bid Date: Jul 24 2025
Miami, FL
Bid Date: Jun 12 2025
Miami, FL
Bid Date: Jul 15 2025
Miami, FL
Bid Date: Jun 26 2025
Miami, FL
Bid Date: Jun 26 2025
Miami, FL
Bid Date: Jul 08 2025
Miami, FL
--
Miami, FL
Bid Date: Jun 20 2025
Miami, FL
Bid Date: Jul 17 2025
Miami, FL
Bid Date: Jun 24 2025
Miami, FL
Bid Date: Aug 04 2021
Miami, FL
Bid Date: Jul 09 2025
Miami, FL
Bid Date: Jul 23 2025
Miami, FL
Bid Date: Jul 16 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
