BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 29, 2025 at 8:00 PM

Updated August 1, 2025

Site work for a civil project in Hampton, New Hampshire. Completed plans call for site work for a water / sewer project.

A comprehensive solids handling upgrade (rotary drum thickener, polymer system, thickened sludge transfer pump, sludge conveyor, sludge storage blowers and diffusers, and thickened sludge. tank piping modifications), a septage receiving upgrades, a new grit dumping station, WAS RASpump upgrades, thickened primary sludge pump and grinder upgrades, sludge valve pit upgrades, influent wet well improvements, and rehabilitation of primary clarifier no. 2 and gravity thickener no. 2. In addition, there will be plant water piping replacement, site piping replacement, SCADA and Instrumentation upgrades, and structural, architectural, and electrical upgrades to the affected buildings structures where required. Completion time for the project will be calculated as calendar days from the date specified in the "Notice to Proceed" as follows: 670 calendar days for substantial completion.. 730 calendar days for final completion Liquidated damages will be in the amount of $1,500.00, for each calendar day of delay from the date established for substantial completion, and $1,500.00 for each calendar day of delay from the date established for final completion. Each BID must be accompanied by a BID BOND payable to the OWNER in the amount of five percent (5%) of the total amount of the BID. As soon as the BID prices have been compared, the OWNER will return the BONDS of all except the three lowest responsive BIDDERS When the AGREEMENT is executed, the bonds of the two remaining unsuccessful BIDDERS will be returned. The BID BOND of the successful BIDDER will be retained until the PAYMENT BOND and PERFORMANCE BOND have been executed and approved, after which it will be returned. A certified check may be used in lieu of a BID BOND. A PERFORMANCE BOND and a PAYMENT BOND, each in the amount of 100 percent of the CONTRACT PRICE, with a corporate surety approved by the OWNER, will be required for the faithful performance of the contract. The OWNER may waive any informalities or minor defects or reject any and all BIDS Any BID may be withdrawn prior to the above scheduled time for the opening of BIDSor authorized postponement thereof. Any BID received after the time and date specified shall not be considered. No BIDDER may withdraw a BID within 60 days after the actual date of the opening thereof. Should there be reasons why the contract cannot be awarded within the specified period, the time may be extended by mutual agreement between the OWNER and the BIDDER.

Post-Bid

Water / Sewer

$11,500,000.00

Public - City

Site Work

214

42

15

5

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
404
Active Projects
182
Bidding Soon
3,283
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.