BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 2, 2025 at 8:00 PM

Updated July 3, 2025

Renovation of a civil project in San Fernando, California. Conceptual plans call for the renovation of a water / sewer project.

The City of San Fernando is requesting proposals from qualified, interested firms to provide professional Engineering Design Services for a new Well No. 2A Nitrate Treatment System. The purpose of this Project is to add an Envirogen Sim PACK Ion Exchange Nitrate Treatment System at the well 2A site location. The New Treatment System is to remove Nitrate impacted water from Well No. 2A source water to control Nitrate contaminant level. The key elements of the project include the constructing and upgrading of well 2A and the addition of a new Envirogen Sim PACK Ion Exchange Nitrate Removal System. The new system is to be housed in a newly designed building expanding the current building to incorporate and accommodate the new treatment system and its related appurtenances. The new treatment system effluent treated water will produce acceptable water quality to deliver directly into the distribution system. Consultant shall prepare construction documents for the Project for bidding and provide technical support during construction. The design will also include the construction of the piping, flow control valves at the well 2a and treatment plant site for acceptable effluent water quality to be delivery directly into the distribution system. As part ofthe Project, the existing Well No. 2A pumping equipment, MCC Panels, tie into SCADA, Electrical Components and transfer switches will be upgraded. The Consultant shall also assist in required permitting and environmental documents. I. PURPOSE The City of San Fernando {City) is soliciting proposals from qualified Consultants to provide Engineering Design Services for Well No. 2A Nitrate Treatment System- City Project No. 7630 {Project). The purpose of this Project is to add a New Envirogen Sim PACK Ion Exchange Treatment System in line at impacted Well No. 2A site for the reduction of overall Nitrate levelsdelivered to the distribution system. Consultant shall prepare construction documents for the Project for bidding and provide technical support during construction. II. PROJECT SCHEDULE The City plans to complete the design and prepare construction documents as soon as possible or no later than Jan 2026. Construct and remodel existing with the addition ofa new section of building to house the new 2000 gpm Envirogen Sim PACK Ion Exchange Treatment System and its necessary related appurtenances at Well 2a Site along with all necessary pipe work to be able to run Well 2A into the new Nitrate Treatment System . To be include are necessary upgrades to Well No. 2A pumping equipment, electrical upgrades, flow control piping, and necessary valveing with water line extension or modification necessary to be able to incorporate the new Envirogen SimPACK Ion Exchange Treatment System to Well 2A and into the distribution system including necessary SCADA system upgrades to monitor and control the new system.

Conceptual

Water / Sewer

$1,870,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
608
Active Projects
308
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 24, 2026

Project location map

Multiple Locations, San Fernando, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.