BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 19, 2025 at 8:00 PM

Updated August 20, 2025

Site work for a water / sewer project in Shallotte, North Carolina. Completed plans call for site work for a water / sewer project.

As of August 19, 2025, this project has not yet been awarded. A timeline for award has not yet been established. The Town is accepting informal bids to relocate a sewer force main line in the Village Point Estates Subdivision directly to the Village Point subdivision. The Contractor shall furnish all labor, materials, tools and equipment necessary to complete all General Work and Requirements as herein specified and shown on the accompanying drawings. Included are the following: 1. Mobilization 2. Temporary Environmental Controls 3. Removal and Repair of Trees 4. Maintaining Traffic 5. Removal of Excavated Material and Storage of Materials 6. Prevention of Air and Water Pollution Through Dust and Dirt Control 7. Progress 8. Maintenance of Trenches and Excavations 9. Maintenance of Flow 10. Replacements 11. Seeding

Bid Results

Water / Sewer

$131,150.00

Public - City

Site Work

5

6

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
41
Bidding Soon
499
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2025

August 29, 2025

Project location map

Multiple Locations, Shallotte, NC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.