BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 31, 2025 at 8:00 PM

Updated August 1, 2025

Site work for a water / sewer project in Saint Augustine Beach, Florida. Completed plans call for site work for a water / sewer project.

St. Johns County County is soliciting quotes from qualified suppliers to perform repairs and CIP membrane cleaning on three (3) two-stage R/O Trains as described in Attachment B Scope of Services. St. Johns County "County" is soliciting quotes from qualified suppliers to perform repairs and CIP membrane cleaning on three (3) two-stage R/O Trains located at the North Beach RO WTP located at 415 19th Street, St. Augustine, FL 32084 . Repairs: Contractors shall only shut down one (1) R/O Train at a time for performing repairsinstalling new parts. After each R/O Train has been repaired, contractor will test the R/O Train and place train back into operation. CIP Membrane Cleaning: Contractor shall install and test a new bag filter housing. Testing shall be done by starting the CIP pump to recirculate Permeate water within the CIP storage tank. PARTS FOR TRAINS # 1 & 2: QTY DESCRIPTION 6 Wika 316SS Press Gauge, Liquid Filled, 2.5 Dia, 0-300 PSI, 1/4" MPT Bottom Mount 2 Wika 316SS Press Gauge, Liquid Filled, 2.5 Dia, 0-100 PSI, 1/4" MPT Bottom Mount 12 Hydranautics 1.25" Retaining Snap Ring for Perm Port on End Cap 6 1" FPT Inline Battery Operated Digital Flow/Totalizer Meter 2 Signet 8150 Battery Powered Flow Meter/Totalizer for 4" Blend Water, Pipe Mount 2 Signet 8150 Battery Powered Flow Meter/Totalizer for 2" Feed Water, Pipe Mount 2 4" Signet PVC Installation Saddle for 8150 Flow Meter 2 2" Signet PVC Installation Saddle for 8150 Flow Meter 1 LOT Sch80 PVC pipe, fittings and hose to r perform the repairs and install new parts. PARTS FOR TRAIN # 3: QTY DESCRIPTION 3 Wika 316SS Press Gauge, Liquid Filled, 2.5 Dia, 0-300 PSI, 1/4" MPT Bottom Mount 1 Wika 316SS Press Gauge, Liquid Filled, 2.5 Dia, 0-100 PSI, 1/4" MPT Bottom Mount 3 2" MPT Cam-Loc MxF Fittings Sets for CIP Hose Connections 1 Codeline Complete Head Assembly for 80A30 Pressure Vessel 1 Codeline Permeate Port 1' FNPT 1 Codeline 8" Dia Quad Head Seal for End Cap 1 Codeline Retaining Ring for End Cap 3 1" FPT Inline Battery Operated Digital Flow/Totalizer Meter 3 2" Sch80 PVC True Union Ball Valve 1 Signet 8150 Battery Powered Flow Meter/Totalizer for 4" Blend Water, Pipe Mount 1 Signet 8150 Battery Powered Flow Meter/Totalizer for 3" Feed Water, Pipe Mount 1 4" Signet PVC Installation Saddle for 8150 Flow Meter 1 3" Signet PVC Installation Saddle for 8150 Flow Meter 2 2" Pass 75L 350psi SS Flexible Vic Coupling 4 1.5" Pass 75L 350psi SS Flexible Vic Coupling 1 LOT Sch80 PVC pipe, fittings and hose to perform the repairs and install new parts Award value is undisclosed

Award

Water / Sewer

$75,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
179
Active Projects
85
Bidding Soon
1,284
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 25, 2025

July 25, 2025

Project location map

415 Nineteenth St, Saint Augustine Beach, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.