Site work for a water / sewer project in McAdenville, North Carolina. Completed plans call for site work for a water / sewer project.

**As of September 16, 2025, the project was awarded to State Utility Contractors, with an awarded amount of $2,754,863.00 for Project 1 and $2,408,744.00 for Project 2, with a total awarded amount of $5,163,607.00** Project 1 Primarily Consists of the Installation of 2,600 Lf of 10" Water Line and 855 Lf of 12" Water Line Using a Combination of Trenching and Hdd Construction Methods, Two 8" Meters, and Two 10" Backflow Preventers. Project 2 Involves the Replacement of 7,130 Lf of Existing 2" Water Lines With 6" Water Lines, Hydrants, Service Reconnections Question Deadline All questions related to this bid shall be submitted in writing to lrudd@withersravenel.com atleast 7 calendar days prior to bid opening to receive consideration. Questions received after that time will not be answered or accepted. All bids must be accompanied by a certified or cashier's check or bid bond in the amount of 5% of the total amount bid made payable to the Owner. No bid shall be withdrawn for a period of 90 consecutive calendar days after bid opening except as provided in Information for Bidders. Bidders must show evidence that they are licensed to perform the work in the Bid Documents as required by the North Carolina General Statutes Chapter 87. The Owner reserves the right to reject any/all bids, to waive formalities, or to reject non-conforming, non-responsive, or conditional bids. The Owner reserves the right to award a contract to the lowest, responsive, responsible bidder or bidders, taking into consideration quality, performance, and time. The Owner is an Equal Opportunity Employer and encourages bidding from small, minority and female businesses (M/WBE), disadvantaged business enterprise (DBE), historically underutilized businesses (HUB). A. This section includes procedural requirements for compiling and submitting operation and maintenance data require to complete the project. A. This Section specifies general administrative and procedural requirements for warranties and bonds required by the Contract Documents, including manufacturers' standard warranties on products and special warranties. 1. Furnish all labor, equipment, materials, and incidentals necessary to perform and complete concrete curing in accordance with the plans. All materials, testing, and procedures shall be of the type specified herein. A. Scope of Work: 1. Furnish all labor, equipment, materials, and incidentals necessary to implement erosion and sedimentation control methods in accordance with the plans. All materials, testing, and procedures shall be of the type specified herein. B. Section Includes: 1. Temporary Silt Fencing 2. Diversion Channels. 3. Utility Trenches. 4. Ditch Liner Matting 5. Check Dams. 6. Sediment Basins. 7. Sediment Traps. 8. Inlet Protection. 9. Site Stabilization. A. The work covered by this section consists of all work necessary to furnish and install the pipeline tracer wire system used to locate buried underground pipelines. B. All materials used on this project must have a preliminary inspection by the Inspector before being used for construction purposes. Rejection of materials not meeting specifications shall be immediately removed from the job site. 1. Furnish all labor, equipment, materials and incidentals necessary to perform and complete the disinfection of potable water lines and appurtenances in accordance with the plans. All products and procedures shall be of the type and class specified herein. Furnish all services, equipment, materials, and labor for completely and properly installing, and testing underground utilities using directional drilling. All required support, including drilling tool suppliers, survey systems, mud cleaning, mud disposal, environmental protection and restoration, and other required support systems used during this operation shall be provided by the CONTRACTOR. 1. Furnish all labor, equipment, materials and incidentals necessary to install and complete installation of potable water lines and appurtenances in accordance with the plans. All pipe and appurtenance material shall be of the type and class specified herein. 2. All pipeline and appurtenance excavation, bedding, pipe laying, jointing and coupling of pipe joints shall be completed as described herein. A. The work covered by this section consists of all work necessary to furnish and install the pipeline tracer wire system used to locate buried underground pipelines. B. All materials used on this project must have a preliminary inspection by the Inspector before being used for construction purposes. Rejection of materials not meeting specifications shall be immediately removed from the job site.

Award

Water / Sewer

$5,163,607.00

Public - City

Site Work

20

20

19

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
262
Active Projects
162
Bidding Soon
1,874
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 30, 2025

August 28, 2025

Project location map

Multiple Locations, McAdenville, NC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.