BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 18, 2025 at 8:00 PM

Updated June 26, 2025

Site work and paving for a road / highway in North Dighton, Massachusetts. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Roadway Improvements - Dighton-Rehoboth Regional High School The scope of work includes the reclamation and repaving of approximately 1,200 linear feet of existing roadway, as well as the installation of a minimum of two (2) or three (3) asphalt speed bumps. All work shall comply with applicable local, state, and federal regulations, including Massachusetts procurement laws under M.G.L. c. 30, &39M. The scope of work includes, but is not limited to: - Pulverizing the existing 1,200' roadway section. - Fine grading, compacting, and removal of excess materials. - Installation of a 2" binder course and a 1.5" top coat of hot mix asphalt. - Installation of at least two (2) speed bumps (asphalt or precast per recommendation). - Site cleanup and line striping. - Installation of three-speed bumps - Optional: Provide pricing for asphalt curbing along the section (approximately 600 linear feet). Contractors may provide optional alternate pricing for: - Additional paving services in adjacent lots or loop roads. - Installation of high-durability traffic markings or signage related to traffic calming. Dighton Rehoboth Regional School District does not discriminate based on race, color, religion, gender, national origin, age, marital status, veteran status, disability, sexual orientation, gender identity, or any other legally protected group.

Post-Bid

Roads / Highways

$200,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
710
Active Projects
390
Bidding Soon
3,528
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 25, 2025

July 25, 2025

Project location map

2700 Regional Rd, North Dighton, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.