Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 14, 2025 at 8:00 PM
Updated July 15, 2025
Renovation of a residential development in Baltimore, Maryland. Completed plans call for the renovation of a residential development.
The Contractor shall supply all labor, material, supervision, equipment, insurance, permits including U&O (Unit of Occupancy Permit) and all other incidentals required to complete the work items listed below as requested by HABC, in accordance with all applicable federal, state and local regulations. Locations: 1620 Delano Ct, 1632 Bruce Ct. Completion date of 30 days upon NTP date. General: 1. Remove and properly dispose of all Trash, Furniture and Miscellaneous Items in the Unit. 2. Replace closet shelving/closet rod as necessary 3. Final Cleaning of Entire Unit to Make Ready for Occupancy. Bathrooms: 1. Remove existing sink, supply and install new Vanity Cabinet w/ Vanity Bowl and faucet 2. Clean existing toilet and replace round toilet seat 3. Remove existing, supply and install New Medicine Cabinet with Mirror 4. Remove existing, supply and install all new bathroom Accessories, Non-UFAS 5. Resurface existing tub and shower wall 6. Remove existing tub faucet, tub spout and showerhead, supply and install new tub faucet, tub spout and showerhead. 7. Remove existing shower rod, supply and install new shower rod Kitchen: 1. Remove existing kitchen cabinets, Install HUD severe use base and wall cabinets "Magnolia Cabinetry Harvard in 'Honey'" (HABC will supply) 2. Remove existing countertop, supply and install new countertops. 3. Remove existing rangehood, supply and install Broan #4100 range hood (Black) 4. Supply and install single bowl stainless steel kitchen sink and faucet with stainless steel 1-1/2" (inch) drain line. 5. Remove existing, supply and install laundry hookup box and hot /cold water valves. Bedroom # 1 (1 st Floor): 1. Remove existing vertical window blinds, supply and install new vertical window blinds (1) 2. Clean exterior and interior of heating convector of any debris. 3. Clean window frame including sills and wells (Lead Testing) and window glass. 4. Paint existing Closet shelf and pole. Bedroom # 2 (2 nd Floor): 1. Remove existing window blinds, supply and install new window blinds (2) 2. Remove existing receptacle covers, supply and install new receptacle covers 3. Clean exterior and interior of heating convector of any debris. 4. Clean window frame including sills and wells (Lead Testing) and window glass 5. Paint existing closet shelf and pole. Bedroom # 3 (2 nd Floor): 1. Remove existing vertical window blinds, supply and install new vertical window blinds (2) 2. Clean exterior and interior of heating convector of any debris. 3. Clean window frame including sills and wells (Lead Testing) and window glass. 4. Paint existing Closet shelf and pole. Livingroom: 1. Remove existing window blinds, supply and install new window blinds (2) 2. Clean window frame including sills and wells (Lead Testing) and window glass 3. Remove existing receptacle covers, supply and install new receptacle covers 4. Clean exterior and interior of heating convector of any debris. 5. Clean window frame including sills and wells (Lead Testing) and window glass 6. Paint existing closet shelf and pole. Mechanical / Plumbing: 1. Check and Inspect Gas Distribution (Stove) for service and repair any leaks. 2. Water Distribution (Bathroom & Kitchen) for leaks, repair leaks throughout whole unit 3. Inspect and Repair (if necessary) Drain, Water & Vent (Bathroom and Kitchen, toilets) Electrical: 1. Remove existing cover plates, supply and install all Switches / Receptacles and metal cover plates. 2. Remove existing raceways, supply and install new raceways throughout entire unit 2. Check Electric Service Panel for Gaps/Missing Breakers/Doors. 3. Remove existing light fixtures, supply and install LED integrated light fixtures in common areas, kitchen, living room and bathroom. 4. Install 10 yr. sealed smoke detectors in every bedroom 5. Install combination smoke / carbon monoxide detectors on 1 st and 2 nd Floor common areas Painting/Drywall Repair: 1. Supply all materials to Paint the Entire Units to Include: o Walls and ceilings shall be painted with two finish coats eggshell latex. o Kitchen and bathroom walls & ceilings, and all doors, shall receive a semi-gloss final finish coat. o Paint existing handrails on 1 st and 2 nd level stairways o Exterior door and frame, porch front and steps and exterior railing shall be painted (Lead Testing) o The Contractor shall be responsible for all drywall repairs, point-up and resulting painting required, ensuring a high-quality finish that is acceptable to the HABC Housing Management. o Paint shall be Sherwin Williams "Pro-Mar 200" in HABC Antique White color (or brand of equal color, finish, durability, etc.). o The Contractor shall follow United States Environmental Protection Agency (EPA) Lead-Based Paint Renovation, Repair and Painting (RRP) Program Rules. Flooring: 1. Supply and install lifeproof Rigid Core Luxury Vinyl Flooring throughout entire unit 2. All floors must be level before applying flooring... 3. Replace all treads and risers 4. Remove cove base, Supply and install 4" Baseboard with Quarter Inch Round shoe molding and caulk as needed throughout unit.
Bid Results
Residential Subdivision
$45,400.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 27, 2025
July 28, 2025
1632 Bruce Ct, Baltimore, MD
Related To This Project
Baltimore, MD
Bid Date: Jul 02 2025
Baltimore, MD
Bid Date: Sep 03 2025
Baltimore, MD
Bid Date: Jul 21 2025
Baltimore, MD
Bid Date: Jun 25 2025
Baltimore, MD
Bid Date: Aug 25 2025
Baltimore, MD
Bid Date: Jun 25 2025
Baltimore, MD
Bid Date: Jul 02 2025
Baltimore, MD
Bid Date: Jun 27 2025
Baltimore, MD
Bid Date: Jun 18 2025
Baltimore, MD
Bid Date: Aug 27 2025
Baltimore, MD
--
Baltimore, MD
Bid Date: Jul 22 2025
Baltimore, MD
Bid Date: Jul 09 2025
Baltimore, MD
Bid Date: Jun 24 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
