BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 23, 2025 at 8:00 PM

Updated July 24, 2025

Site work and paving for a mixed-use development in Aurora, Illinois. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The City of Aurora, Illinois (City) is in need of professional services from qualified engineering consultants for Phase III Construction Engineering Services for a federal resurfacing project. As a part of the selection process, the interested consultants are required to submit a Statement of Qualifications (SOQ) to perform the requested work. This project is located along several routes throughout the City of Aurora as listed below: Kautz Rd (FAU 1555) from Ridge Ave to Ellington Dr Ellington Dr (FAU 1556) from Kautz Rd to Keating Dr Keating Dr (FAU 1556) from Ellington Dr to Aurora City Limits (~300' west of Normantown Rd) Randall Rd (FAU 2505) from Sullivan Rd to Galena Blvd Eola Rd (FAU 2531) from Keating Dr to Hafenrichter Rd The project is located in Kane, DuPage, and Will Counties. The total net project length is 3.97 miles. The anticipated construction cost is around $3,300,000, and the anticipated length is 60 working days. The work for both projects consists of hot-mix asphalt surface course removal, pavement patching, polymerized hot-mix asphalt binder course, hot-mix asphalt surface course, recessed pavement markings, removal and replacement of concrete sidewalk and curb and gutter, landscaping and all other appurtenant work required to complete the project in accordance with the plans. The Pre-Final Phase II Plans, Specifications, and Estimates (PS&E) have been submitted to IDOT for review. The project is targeting the November 7, 2025 State letting. The latest submitted plans and specs are attached for reference. The Construction and Construction Engineering are anticipated to be funded with a combination of federal (STP-L) and local funds. Local funds may be MFT or non-MFT. Additional federal funding is being pursued from what is programmed. The project may be delayed if Phase I approval is not received in time (currently under review). If the project is not able to make the November 7, 2025, State letting, it may be cancelled entirely. Question Submission Deadline:June 20, 2025, 8:00am

Conceptual

Roads / Highways

$3,300,000.00

Public - City

Paving, Site Work

48

9

2

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
444
Active Projects
253
Bidding Soon
3,314
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 2, 2026

Project location map

Multiple Locations, Aurora, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.