Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 30, 2025 at 8:00 PM
Updated July 1, 2025
Site work and outdoor lighting for a stadium in Alcorn, Mississippi. Working plans call for site work for a stadium; and for outdoor lighting for a stadium.
As of June 30, 2025, project is canceled. As of this time, it is unknown if project will be rebid or not. David Whitney HPER Complex Lighting Alcorn State University reserves the right to accept or reject any or all proposals/qualifications and to waive informalities. Alcorn State University is soliciting sealed proposals from qualified vendors to provide and install a high-performance LED lighting system capable of multi-color functionality for the Whitney Complex Gymnasium, located on the Lorman, Mississippi campus. This lighting system will be used to enhance athletic events, special ceremonies, and university functions through dynamic and energy-efficient illumination Question Deadline 07/02/2025 All inquiries concerning this RFP should be directed to: Ms. Mertha George Office of Purchasing 1000 ASU Drive 509 Lorman, MS 39096 mgeorge@alcorn.edu (601) 877-6154 Project Objectives o Replace the existing gymnasium lighting with modern, energy-efficient LED lights. o Integrate RGB or RGBW (Red, Green, Blue, White) capabilities for multi-color lighting. o Ensure lighting meets NCAA standards for indoor athletics. o Provide a control system that allows easy management of lighting scenes, colors, brightness, and scheduling. o Improve visual appeal and support school branding efforts during events. Scope of Work o Conduct on-site assessment of existing lighting infrastructure and confirmation of design needs. o Create a custom lighting layout using photometric analysis software. o Determine optimal fixture placement to achieve uniform illumination and visual comfort. o Coordinate with university stakeholders for approval of lighting design The selected vendor will be responsible for: o Removal of existing lighting fixtures as needed. o Supply and installation of LED multi-color fixtures (minimum lifespan: 50,000 hours). o Installation of a user-friendly control system with both manual and programmable automation. o Electrical integration and compliance with applicable codes. o Training of university staff on operation and maintenance. o Warranty and post-installation support (minimum 5 years preferred). 4. Technical Specifications o Fixture Type: High-bay LED with color mixing (RGB or RGBW). o Mounting Height: 30-50 ft. o Illuminance Level: Minimum 100 foot-candles on the playing surface. o Dimming Capabilities: 0-100% dimming range. o Control System: DMX or equivalent protocol; wireless and/or wired interface. o Energy Efficiency: Must meet or exceed DLC Premium standards. o Compatibility: Must be compatible with existing power infrastructure or include necessary upgrades.
Final Planning
Arenas / Stadiums
$117,000.00
Public - State/Provincial
Outdoor Lighting, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 23, 2025
December 30, 2025
1000 Asu Dr, Alcorn, MS
Related To This Project
Alcorn, MS
Bid Date: Jul 22 2025
Alcorn, MS
Bid Date: Jul 23 2025
Alcorn, MS
Bid Date: Jul 23 2025
Alcorn, MS
Bid Date: Jul 31 2025
Alcorn, MS
Bid Date: Jul 31 2025
Alcorn, MS
Bid Date: Jul 31 2025
Alcorn, MS
Bid Date: Nov 18 2025
Alcorn, MS
Bid Date: Jul 29 2025
Alcorn, MS
Bid Date: Jul 31 2025
Alcorn, MS
Bid Date: Jul 23 2025
Alcorn, MS
Bid Date: Jun 20 2025
Alcorn, MS
Bid Date: Apr 17 2025
Alcorn, MS
Bid Date: Aug 14 2025
Alcorn, MS
Bid Date: Mar 13 2025
Alcorn, MS
Bid Date: Nov 14 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
