BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 26, 2025 at 8:00 PM

Updated August 16, 2025

Renovation of a water / sewer project in Tampa, Florida. Completed plans call for the renovation of a water / sewer project.

The Florida State Fair Authority (FSFA) is seeking qualified and experienced contractors to provide full design-build services for the demolition and replacement of the existing chiller plant at the Florida State Fairgrounds in Tampa, FL. The scope includes demolition of the existing facility and installation of a new chiller plant, featuring two (2) 1000-ton magnetic centrifugal chillers, associated pumps, cooling towers, piping, controls, and all necessary ancillary systems. Proposers are also asked to submit an alternative proposal for replacement using air-cooled chillers with comparable capacity and performance. A. Demolition o Complete demolition and removal of existing chiller plant infrastructure, including but not limited to: o Chillers o Cooling towers o Pumps and motors o Control systems o Associated mechanical and electrical components o Site cleanup and preparation for new installation o Environmental mitigation, permitting, and disposal in compliance with local, state, and federal laws B. New Chiller Plant Installation o Design, furnish, and install two (2) 1000-ton magnetic centrifugal chillers (watercooled) o Provide and install: o New pumps, variable speed drives o Cooling towers with structural supports and sound attenuation (if required) o Electrical service upgrades/modifications o Controls and integration with Building Management System (BMS) o Piping, valves, insulation, and accessories o Structural, mechanical, and electrical engineering, including stamped drawings o Commissioning, performance testing, and training o Provide O&M manuals and warranties C. Alternative Proposal - Air-Cooled Chillers (OPTIONAL) o Provide a separate proposal for replacing the existing system with air-cooled chillers of comparable capacity (2,000 total tons) o Include: o Performance data and efficiency comparisons o Space, noise, and aesthetic considerations o Cost-benefit analysis for lifecycle cost vs. water-cooled option. Questions regarding this RFP must be submitted via email to: Michael.Rogalsky@floridastatefair.com

Post-Bid

Water / Sewer

$500,000.00

Public - State/Provincial

Renovation

9

3

2

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
336
Active Projects
172
Bidding Soon
2,431
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 15, 2025

November 1, 2025

Project location map

To Be Determined, Tampa, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.