Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 10, 2025 at 8:00 PM
Updated July 11, 2025
Site work and new construction of a mixed-use development in Boonville, Indiana. Completed plans call for the construction of a educational facility; and for site work for a educational facility.
Each proposal must be accompanied by a certified check made payable to Warrick County School Corporation in an amount equal to not less than five percent (5%) of the base bid or an acceptable bidder's surety bond made payable to Warrick County School Corporation, not less than five percent (5%) of the base bid, executed by a surety company authorized to do business in the State of Indiana. The certified check or bidder's bond shall be a guarantee that said bidder will, if the contract is awarded to him, execute within ten (10) days from the acceptance of his proposal a contract for the work bid upon, and furnish acceptable surety bonds as set forth in the specifications. However, if the contractor has not executed the contract within the ten (10) day period or has failed to furnish acceptable surety bonds as indicated, the Owner reserves the right to award the contract to the most responsive and responsible bidder, and the bid security will be forfeited. Bids shall be properly and completely submitted on the latest version of Contractor's Bid for Public Bidding Form No. 96, as prescribed by the State Board of Accounts for the State of Indiana, in addition to the Bid Form included in the Project Manual. No bidder may withdraw his bid for a period of sixty (60) days after the date set for the opening of bids. Unified lump sum bid proposals will be accepted to include all construction work. SUBSTANTIAL COMPLETION February 1, 2026. The work is to be constructed according to Plans and Specifications prepared by VPS Architecture, 528 Main Street, Suite 400, Evansville, Indiana 47708, (812) 423-7729. Doc notes: It is mandatory that each bidder shall obtain one (1) complete set of bidding documents. A maximum of two (2) sets of bid documents will be available on a refundable deposit basis to each bidder or sub-bidder. If mailing is required, mailing costs shall be paid for by the bidder or sub-bidder. The Bidder shall refer to the Instructions to Bidders, bound in the Project Manual, for additional bidding procedures and requirements. Question Deadline 07/02/2025 Bidders and sub-bidders requiring clarification or interpretation of the Bidding Documents shall make a written request which shall reach the Architect at least seven days prior to the date for receipt of Bids and shall be directed to George S. Link, AIA (glink@vpsarch.com) at the office of the Architect, VPS Architecture, 528 Main Street, Suite 400, Evansville IN 47708 OWNER'S RIGHT TO REJECT BIDS :Owner reserves the right to reject any or all bids and to waive any defects or irregularities if deemed to be for the best interest of the Corporation.
Bid Results
Educational
$753,900.00
Public - County
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 9, 2025
August 8, 2025
3377 S Yankeetown Rd, Boonville, IN
Related To This Project
Boonville, IN
Bid Date: Jul 15 2025
Boonville, IN
--
Boonville, IN
Bid Date: Jul 23 2025
Boonville, IN
Bid Date: Feb 10 2021
Boonville, IN
Bid Date: Sep 03 2025
Boonville, IN
Bid Date: Oct 09 2025
Boonville, IN
Bid Date: Oct 23 2025
Boonville, IN
Bid Date: May 20 2025
Boonville, IN
Bid Date: Apr 09 2025
Boonville, IN
Bid Date: Feb 06 2025
Boonville, IN
Bid Date: Feb 18 2025
Boonville, IN
Bid Date: Aug 22 2024
Boonville, IN
Bid Date: Nov 16 2021
Boonville, IN
Bid Date: Sep 10 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
