BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 4, 2025 at 8:00 PM

Updated August 5, 2025

Renovation of a playground / park / athletic field in Villa Park, Illinois. Completed plans call for the renovation of a playground / park / athletic field.

The Oakbrook Terrace Parkdistrict Reserves the Right to Reject Any or All Bidsreceived, to Waive Any Formal I Ties or Tech Ni Cal I Ties Ofthe Bid or to Reject Any Non-respon Sive Bid in the Interest of the Oakbrook Terrace Park District. 1. MATERIALS AND LABOR Please note that product names are for reference purposes only. Approved equal products are also acceptable. Exterior Main Entrance (Pair of Doors) _ Remove the existing pair of doors, Sidelite transform framing, and glass from opening. _ Furnish and install a pair of Special-Lite SL-14 Medium Stile Monumental Full View Glass Aluminum Doors (36" X 84") and heavy-tube aluminum framing in dark bronze anodized finish. _ New doors and framing glazed with 1" insulated clear tempered glass. _ New doors to include: Heavy-duty concealed continuous gear hinges, (1) heavy duty door closer, concealed vertical rod exit devices, offset pulls, key cylinder, and kickdown door holders. _ Re-install the existing single door operator and header mounted safety sensor. Interior Main Entrance (Pair of Glass Aluminum Doors) _ Replace pivots as needed to raise doors. _ Install (1) new door closer, (2) kickdown door holders, and threshold. Exterior Men's Restroom Door _ Remove the existing door and frame from opening furnish and install a 16-gage galvannealed prime coat hollow metal frame and an 18-gage galvannealed prime coat steel door (36" X 84"). _ New door to include: A closed top cap, NRP ball bearing heavy-weight hinges, extra-duty arm heavy-duty door closer, double cylinder mortise deadbolt, kickplate, threshold, sweep, and perimeter weatherstripping. Exterior Women's Restroom Door _ Remove the existing door and frame from opening furnish and install a 16-gage galvannealed prime coat hollow metal frame and an 18-gage galvannealed prime coat steel door (36" X 84"). _ New door to include: A closed top cap, NRP ball bearing heavy-weight hinges, extra-duty arm heavy-duty door closer, double cylinder mortise deadbolt, kickplate, threshold, sweep, and perimeter weatherstripping. Exterior Mechanical Room (Pair of Doors) _ Remove the existing doors and frame from opening. _ Furnish and install a 16-gage galvannealed prime coat hollow metal frame and a pair of 18-gage galvannealed prime coat steel doors (36" X 84"). _ New doors to include: Closed top caps, NRP ball bearing heavy-weight hinges, (1) extra-duty arm heavy-duty door closer, door chain entry function lever mortise lock with deadbolt, flushbolts, (2) piece astragal, threshold, sweeps, perimeter weatherstripping, and (2) kickdown door holders Exterior Theater Stage Entrance (Pair of Doors) _ Remove the existing doors and frame from opening. _ Furnish and install a 16-gage galvannealed prime cost hollow metal frame and a pair of 18-gage galvannealed prime coat steel doors (48" X 84"). _ New doors to include: Closed top caps, NRP ball bearing heavy-weight hinges, (2) heavy-duty door closers, (2) surface overhead stop/holders coordinator, astragal, carry bar, (2) surface vertical rod exit devices, (1) classroom function lever trim, key cylinder, threshold, sweeps, perimeter weatherstripping, and (2) kickdown door holders. Exterior Rear Entrance (Pair of Doors) _ Remove the existing doors and frame from opening _ Furnish and install a 16-gage galvannealed prime coat hollow metal frame and a pair of 18-gage galvannealed prime coat steel doors (36" X 84"). _ New doors to include: 3" X 33" safety wire glass vision lite kits, closed top caps, NRP heavy-weight ball bearing hinges, (2) heavy-duty door closers, (2) rim exit devices, (1) storeroom function lever trim, key removable mullion, (2) key cylinders, (2) kickplates, threshold, (2) sweeps, and perimeter weatherstripping. 2. ADDITIONAL SERVICES _ Deliver all scheduled materials to the jobsite. _ Provide manufacturers' standard warranties (and as specified in the contract documents). _ The Contractor will be responsible for disposal of removed doors. 3. COMPLETION DATE This project must be completed by October 30, 2025. 4. REQUIRED PERMITS Contractor is required to obtain all permits for the Project as may be required by the County or municipality. The Owner shall be responsible for the costs of any permits required

Award

Playgrounds / Parks / Athletic Fields

$62,949.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
454
Active Projects
246
Bidding Soon
3,321
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 15, 2025

July 24, 2025

Project location map

1S325 Ardmore Ave, Villa Park, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.