BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 27, 2026 at 8:00 PM

Updated August 2, 2026

Site work for a bridge / tunnel in Pincher Creek, Alberta. Completed plans call for site work for a bridge / tunnel.

WORK OF THIS CONTRACT Work to be completed under this Contract includes, but not limited to, supplying all materials, equipment, products, labour, and transportation for the Castle Provincial Park - Lost Creek Bridge Replacement project. Work of this Contract is comprised of the following: .1 Prime Contractor responsibilities .2 Project Management and Coordination .3 Safeguarding of work areas .4 Environmental Requirements .5 Removal and Salvage Existing Bridge Structure and Abutments .6 Vegetation Removal .7 Excavating and Grading .8 Topsoil Stripping and Placement .9 Soil Decompaction .10 OHV/Multi-Use Bridge and Abutment Installation .11 Gabion Basket Installation .12 Heavy Rock Riprap Placement .13 Seeding and Hydromulch .14 Miscellaneous and incidental works. Location: Castle Provincial Park - Lat / Long is: 4927'41.91"N 11432'29.45"W

Post-Bid

Bridges / Tunnels

$1,200,000.00

Public - State/Provincial

Site Work

1

2

2

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
24
Active Projects
9
Bidding Soon
143
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 27, 2026

September 1, 2026

Project location map

AB-774, Pincher Creek, AB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.