Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 29, 2025 at 8:00 PM
Updated July 30, 2025
Site work for a water / sewer project in Hingham, Massachusetts. Completed plans call for site work for a water / sewer project.
The Town of Hingham owns and operates (through Weir River Water System) an existing pump house for the purposes of withdrawing water from Accord Pond. The pump system itself is housed in a structure that is approximately 36'x25' and connects to a gate house before the main intake lines extend out to the pond. According to available records there are currently two intake lines in the pond. One is an inactive, partially buried, 10" pipe that is connected directly to the pump house and extends approximately 400 feet into the pond. The active line exits the gatehouse before extending 50 +/- feet into the pond and is a 16" Cast Iron (C.I.) pipe. Deadline for Questions:June 25, 2025, 11:00am Questions shall be submitted via Town's eProcurement Portal Deadline for Questions:July 14, 2025, 11:00am Proposed work includes the installation of a new Class 52 10 Cement Lined Ductile Iron (C.L.D.I.). Intake pipe system that will extend 400 feet +/- out into the pond, where shown on the attached plans. The new pipe shall connect inside the existing gatehouse. Contractor shall furnish and install any/all pipe connections and valving as necessary to allow for the new 10 C.L.D.I. intake pipe to be utilized independently from the existing 16 intake pipe. Contractor shall perform all work required in the pump-house accordingly and extend the new pipe out from the gatehouse through the lawn area and rip-rap embankment and extending out approximately 400 feet into the pond as shown. Contractor shall backfill, compact any/all trenching and restore the rip-rap in-kind. The installation of the intake pipe in the pond will consist of setting the pipe generally as shown on the plans and associated report from Underwater Solutions, copy attached. Concrete footings shall be installed to support the pipe system in the pond, with the pipe profile following 2 +/- above the pond bottom profile. Contractor shall use corrosion resistant metal strapping to secure the newly installed pipe in place to the new footings. The end of the intake pipe will be upturned and fitted with a wedge wire screen with airburst capability, as shown on the plan (or approved equal). It is required that the contractor is self sufficient for power (i.e. generator)
Award
Water / Sewer
$248,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 21, 2025
August 20, 2025
42 Whiting St, Hingham, MA
Related To This Project
Hingham, MA
Bid Date: Feb 26 2019
Hingham, MA
Bid Date: Jul 21 2025
Hingham, MA
Bid Date: Sep 18 2025
Hingham, MA
Bid Date: Sep 04 2025
Hingham, MA
Bid Date: Aug 25 2025
Hingham, MA
Bid Date: Dec 09 2025
Hingham, MA
Bid Date: Nov 06 2025
Hingham, MA
--
Hingham, MA
--
Hingham, MA
Bid Date: May 30 2025
Hingham, MA
Bid Date: May 30 2025
Hingham, MA
Bid Date: May 30 2025
Hingham, MA
Bid Date: May 28 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
