BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 29, 2025 at 8:00 PM

Updated July 30, 2025

Site work for a water / sewer project in Hingham, Massachusetts. Completed plans call for site work for a water / sewer project.

The Town of Hingham owns and operates (through Weir River Water System) an existing pump house for the purposes of withdrawing water from Accord Pond. The pump system itself is housed in a structure that is approximately 36'x25' and connects to a gate house before the main intake lines extend out to the pond. According to available records there are currently two intake lines in the pond. One is an inactive, partially buried, 10" pipe that is connected directly to the pump house and extends approximately 400 feet into the pond. The active line exits the gatehouse before extending 50 +/- feet into the pond and is a 16" Cast Iron (C.I.) pipe. Deadline for Questions:June 25, 2025, 11:00am Questions shall be submitted via Town's eProcurement Portal Deadline for Questions:July 14, 2025, 11:00am Proposed work includes the installation of a new Class 52 10 Cement Lined Ductile Iron (C.L.D.I.). Intake pipe system that will extend 400 feet +/- out into the pond, where shown on the attached plans. The new pipe shall connect inside the existing gatehouse. Contractor shall furnish and install any/all pipe connections and valving as necessary to allow for the new 10 C.L.D.I. intake pipe to be utilized independently from the existing 16 intake pipe. Contractor shall perform all work required in the pump-house accordingly and extend the new pipe out from the gatehouse through the lawn area and rip-rap embankment and extending out approximately 400 feet into the pond as shown. Contractor shall backfill, compact any/all trenching and restore the rip-rap in-kind. The installation of the intake pipe in the pond will consist of setting the pipe generally as shown on the plans and associated report from Underwater Solutions, copy attached. Concrete footings shall be installed to support the pipe system in the pond, with the pipe profile following 2 +/- above the pond bottom profile. Contractor shall use corrosion resistant metal strapping to secure the newly installed pipe in place to the new footings. The end of the intake pipe will be upturned and fitted with a wedge wire screen with airburst capability, as shown on the plan (or approved equal). It is required that the contractor is self sufficient for power (i.e. generator)

Award

Water / Sewer

$248,000.00

Public - City

Site Work

1

7

13

7

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
504
Active Projects
237
Bidding Soon
3,871
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 21, 2025

August 20, 2025

Project location map

42 Whiting St, Hingham, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.