BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 26, 2025 at 8:00 PM

Updated August 27, 2025

Site work and new construction of a municipal facility in Orange Beach, Alabama. Completed plans call for the construction of a municipal facility; and for site work for a municipal facility.

Reference Number 0000390595 Job Location: Orange Beach, AL Competitive Bid #SWA25-01 - Construction of the Orange Beach Recycle Convenience Center for the Solid Waste Disposal Authority of Baldwin County ONE-HUNDRED TWENTY (120) CALENDAR DAYS are allowed for the construction of the project. For the purposes of this Project, a Calendar Day is from midnight to midnight, inclusive of Saturdays, Sundays, and Legal Holidays (as defined herein), on which the Contractor could proceed with construction operations for a period of six hours or more with the normal working forces engaged in performing work on the controlling item or items of work, which normally would be in progress at that time, will be classified as a Calendar Day. All bids must be on blank forms provided in the Specifications with the Contract booklet submitted in its entirety. A cashier's check drawn on an Alabama bank or a Bidder's Bond, payable to SWDA, for an amount not less than five percent (5%) of the amount bid, but in no event more than ten thousand dollars ($10,000) shall be filed with the proposal. The bidder's bond shall be prepared on the form specified and signed by a bonding company authorized to do business in the State of Alabama. A performance bond in the form and terms approved by the SWDA in an amount not less than the contract price will be required at the signing of the contract. A labor and materials bond in the form and terms approved by the SWDA in an amount not less than fifty percent (50%) of the contract price insuring payment for all labor and materials shall also be required at the signing of the contract. In addition, the Contractor must furnish to the SWDA, at the time of the signing of the contract a certificate of insurance coverage as provided in the specifications. Buyer Preferences, Guidelines & Requirements General Requirements - Bid Deposit Required - Contractors License Required - Federally Funded - Insurance Required - License Required - Safety Standards Plan - Warranty Information Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Labor and Materials Bond 50 % No bid shall be withdrawn for a period of thirty (30) days subsequent to the opening of bids, without the consent of the Solid Waste Disposal Authority of Baldwin County, Alabama. The right is reserved to reject any and/or all bids and to waive informalities or irregularities in bid documents, and to furnish any item of material or work, and to change the amount of said contract consistent with applicable law.

Award

Municipal

$1,231,715.00

Public - County

New Construction, Site Work

20

13

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
64
Bidding Soon
659
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 22, 2025

September 1, 2025

Project location map

Russian Rd, Orange Beach, AL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.