Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 20, 2025 at 8:00 PM
Updated August 21, 2025
Demolition, site work, renovation and addition to a civil project in Spring, Texas. Completed plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.
The project is located in Northampton Municipal Utility District at 24235 Gosling Road, Spring, TX 77389. Question Deadline 08/01/2025 at 10:00 AM CT The work consists of providing the necessary labor, materials, equipment, supervision, and plant to construct the Wastewater Treatment Plant Expansion to 1.85 MGD for the Northampton Municipal Utility District in Harris County, Texas. The work includes rehabilitation, improvements, expansion, and construction at the two facilities that comprise the wastewater treatment plant (WWTP). The work at WWTP No. 1 includes, but is not limited to: expansion of Lift Station No. 2 to increase the firm pumping capacity of the two lift stations to 5,139 gpm peak two hour flow; expansion of the headworks to increase the treatment capacity to 5,139 gpm peak two hour flow; rehabilitation of the existing aeration diffuser systems; replacement of the clarifier mechanism at Clarifier No. 1; rehabilitation of Scum Pump Station No. 1; construction of submersible RAS/WAS Pump Station No. 1 with chopper pumps; construction of grating at the Clarifier No. 2 launder trough box; rehabilitation of Scum Pump Station No. 2; pump replacement and rehabilitation of RAS/WAS Pump Station No. 2; rehabilitation of the chlorine contact basin and effluent pump station; rehabilitation of the sludge holding tanks including modifications to the existing decant mechanism; improvements to the existing chemical system including expansion of the sodium bisulfite chemical system to treat up to 5,139 gpm peak two hour flow and ventilation improvements for the storage and feed room; construction of a dechlorination basin with a submersible mixer; replacement of the blowers with four centrifugal blowers, elevated three feet above the 0.2% annual chance floodplain; rehabilitation of the control building; modifications to existing yard piping, including construction of a new outfall and sampling location; protective coatings; and all associated power, instrumentation, plant PLC monitoring, controls, and programming. This project also includes the installation and field testing of a 600kW diesel generator elevated three feet above the current 0.2% annual chance floodplain. he work at WWTP No. 2 includes, but is not limited to: improvements and expansion of the influent basins; construction of an aeration basin to increase the aeration treatment capacity of WWTP No. 2 to 0.90 MGD ADF; rehabilitation and improvements for the existing aeration basin; construction of a 45-foot diameter spiral blade secondary clarifier and submersible scum pump station with chopper pumps to increase the clarifier treatment capacity of WWTP No. 2 to 2,500 gpm peak two hour flow; rehabilitation of the existing secondary clarifier and scum pump station; construction of a chlorine contact basin to increase the disinfection treatment capacity of WWTP No. 2 to 2,500 gpm peak two hour flow; rehabilitation and improvements for the existing chlorine contact basin; replacement of the post-aeration system; improvements to the flow measurement channel to increase flow measurement capacity; construction of two digesters to increase the treatment capacity of WWTP No. 2 to 0.90 MGD ADF; rehabilitation to improvements for the existing digesters, including modifications to the existing decant mechanism and flow metering systems; replacement of the three positive displacement blowers, elevated three feet above the 0.2% annual chance floodplain, to increase the air delivery required by the expanded facility; replacement of the sodium hypochlorite chemical system to treat up to 2,500 gpm peak two hour flow; construction of a non-potable water pump station with self-priming pumps; rehabilitation and improvements to the existing 500 kW diesel generator; modifications to existing yard piping; protective coatings; and all associated power, instrumentation, plant PLC monitoring, controls, and programming. This project also includes modifications to floodproof the existing controls building.
Award
Water / Sewer
$25,756,940.00
Public - City
Addition, Demolition, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 6, 2025
October 6, 2025
24235 Gosling Rd, Spring, TX
Related To This Project
Spring, TX
--
Spring, TX
--
Spring, TX
--
Spring, TX
--
Spring, TX
--
Spring, TX
Bid Date: Jul 16 2025
Spring, TX
--
Spring, TX
--
Spring, TX
--
Spring, TX
Bid Date: Jun 24 2025
Spring, TX
Bid Date: Jun 24 2025
Spring, TX
--
Spring, TX
--
Spring, TX
Bid Date: Jun 17 2025
The Best Gift for Your Business? Seeing the Future of Construction.
We’re unwrapping exclusive project leads early this year. Gain instant access to commercial data that keeps you steps ahead of the competition. Sign up today to see the projects others won't discover until they're already spoken for.
