BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 29, 2025 at 8:00 PM

Updated July 30, 2025

Site work for a water / sewer project in Oak Park, Illinois. Completed plans call for site work for a water / sewer project.

The Village is seeking Bids from qualified plumbing contractors for the replacement of lead and/or galvanized water service lines from the curb stop into the residence as described herewith. Water service lines to be upgraded with this program will be one inch copper from the main to the curbstop, having been previously upgraded through the Village Capital Improvement Program, and lead or galvanized into the structure. The locations and lengths of service line are estimated for bidding purposes. Detail Specifications 1. Location of the Improvements The location of the work is known as: PUBLIC RIGHT-OF-WAY and specific PRIVATE PROPERTIES within the Village of Oak Park, Illinois. Specific locations will be assigned after award of this contract. 2. Description of the Improvements The Village of Oak Park has developed a lead water service line replacement policy that replaces the Village portion of the water service with new water main installation. The typical construction would be to connect a one-inch copper line to the _ inch lead service just past the B-box. A second scenario for the Village to upgrade the public side of the water service is if the homeowner upgrades the private side from the B-box to the meter, then the Village will upgrade the public side from the B-box to the water main. This contract will encounter houses with either scenario which will vary the coordination with Village crews accordingly. The improvements under this contract shall include installing a new continuous one-inch Type K copper water service line on the Owner side of the water service from the curb stop/B-box into the house to the water meter. Work shall include a new meter setting including full-port ball valves before and after the meter with a 1/2" x _ turn brass MPT x MHT boiler drain valve after the meter. A new water meter is optional to the homeowner and if selected, will be delivered to the jobsite. New meter connectors will be furnished, if necessary, by the Village. It is the intent of this contract that the installation of the new water service line will be completed by boring or directional drilling. Any deviations from this construction method, including open cut trenching, shall require Village of Oak Park approval prior to commencing the work. Question Deadline 07/07/2025 at 9:00 AM CT Written questions shall be e-mailed to jeggen@oak-park.us with CDBG WATER SERVICE LINE REPLACEMENT PROGRAM-2025 in the su The Village of Oak Park will receive bids from qualified contractors to perform water service replacements during the calendar year 2025. The Village of Oak Park will receive Bids from qualified contractors to preform water service replacements during the calendar year 2025 pursuant to this Request for Bids. This Bid covers the replacement of the lead and/or galvanized water service lines from the curb stop up to and including the water meter at various locations within the Village of Oak Park All bidders will be required to submit Bid Security in the form of a Certified Check, a Cashier's Check or a Bid Bond in the amount of Ten percent (10%) of the Base Bid, payable to the Village of Oak Park. The successful bidder will be required to post performance security and to provide a certificate of insurance as set forth in the bid package. This contract shall be subject to the provisions of the Prevailing Wage Act (820 ILCS130/1 et seq.) to the extent required by law. This is a Federally-funded project, funded with Community Development Block Grant (CDBG) funds and is thus subject to all applicable Federal rules, regulations and guidelines, including Davis-Bacon and Related Acts. This is a Federally-funded project, funded with Community Development Block Grant (CDBG) funds and is thus subject to all applicable Federal rules, regulations and guidelines, including Davis-Bacon and Related Acts. Processing of Progress Payments will require the submission and approval of Certified Payroll for required pay classes. The Village of Oak Park reserves the right to issue proposal documents and specifications only to those vendors deemed qualified. For more information call the Public Works Service Center at 708.358.5700. The Village Board of Trustees reserves the right to accept or reject any and all bids or to waive technicalities, or to accept any item of any bid. Information is available from the Water & Sewer Project Manager, James Eggen at 708-358-5700 or jeggen@oak-park.us. Contract Bond The successful bidder shall, within ten (10) calendar days after award of the bid, furnish a Contract Bond in the amount of fifty thousand dollars ($50,000.00) for the contract awarded. The bond shall insure faithful performance of the work, and the payment for materials, labor and of the subcontractors. The bond shall be with a surety or sureties with a rating of "A" or better by A.M. Best and Company and such sureties shall be approved by the Village. Bonds in the form of certified or cashier's check shall be made payable to the Village of Oak Park, Illinois. The Contract Bond shall be furnished in the same number of copies as the number of copies of the Agreement to be executed. See section XII for a sample copy of the Contract Bond.

Award

Water / Sewer

$81,061.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
462
Active Projects
252
Bidding Soon
3,376
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2025

August 8, 2025

Project location map

Multiple Locations, Oak Park, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.