BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 27, 2025 at 8:00 PM

Updated August 28, 2025

Site work and paving for a road / highway in Rosemount, Minnesota. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Description: 2025 Trails & Facilities Pavement Preservation COUNTY PROJECT NO. 8-036, 28-074, 28-075, 31-121, 31-122, 31-123, 32-117, 46-063, 64-028, 70-026, 85-026, 98-033, 98-035, 98-044 & 98-053 CP 08-36 Removal of bituminous sidewalk and construction of concrete sidewalk on County Road 8 (Wentworth Avenue) between Livingston Avenue and Trunk Highway 3 (South Robert Street) in the City of West St. Paul. CP 28-74 Full depth reclamation of trail with bituminous overlay and ADA improvements on the south side of County Road 28 (Amana Trail) near the intersection with Trunk Highway 3 (South Robert Street) in the City of Inver Grove Heights. CP 28-75 Full depth reclamation of trail with bituminous overlay and ADA improvements on the south side of County Road 28 (Yankee Doodle Road) between Trunk Highway 149 (Dodd Road) and 77th Street West/Argenta Trail in the Cities of Eagan and Inver Grove Heights. CP 31-121 Extension of County Road 31 (Pilot Knob Road) northbound left turn and drainage modifications at 140th Street West in the City of Apple Valley. CP 31-122 Full depth reclamation of trail with bituminous overlay and ADA improvements on the west side of County Road 31 (Pilot Knob Road) from County Road 42 to 134th Street West in the City of Apple Valley. CP 31-123 Full depth reclamation of trail with bituminous overlay on the west side of County Road 31(Pilot Knob Road) from 170th Street to County Road 46 (160th Street West) in the City of Lakeville. CP 32-117 Concrete sidewalk removal and replacement along the north side of County Road 32 (Cliff Road) from Nicols Road to Interstate 35E in the City of Eagan. CP 46-63 Full depth reclamation of trail with bituminous overlay on the south side of County Road 46 (160th Street West) from County Road 23 (Cedar Avenue) to County Road 31 (Pilot Knob Road) in the City of Lakeville. CP 64-28 Concrete median modifications at the intersection of County Road 64 (195th Street West) and Eureka Avenue in the City of Farmington. CP 70-26 Full depth reclamation of trail with bituminous overlay and ADA improvements on the south side of County Road 70 (210th Street) from Keokuk Avenue to County Road 5 (Kenrick Avenue) in the City of Lakeville. CP 85-26 In-lane transverse sinusoidal rumble strips on County Road 85 (Goodwin Ave.) at the intersection with County Road 62 (190th Street East) in the City of Vermillion and Vermillion Township. CP 98-33 Fog seal of the Mississippi River Greenway at Lock and Dam No. 2 in the City of Hastings. CP 98-35 Full depth reclamation of trail with bituminous overlay, ADA improvements, and fog seal of the Mississippi River Greenway from Pine Bend Trail to County Road 56 (Concord Boulevard) in the Cities of Rosemount and Inver Grove Heights. CP 98-44 Bituminous mill with overlay and ADA improvements at the Dakota County Western Service Center in the City of Apple Valley. CP 98-53 Full depth reclamation of trail with bituminous overlay and ADA improvements of the Big Rivers Regional Trail from D Street to Trunk Highway 13 (Sibley Memorial Highway) in the City of Mendota

Award

Roads / Highways

$2,277,056.00

Public - County

Paving, Site Work

137

9

2

5

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
203
Active Projects
47
Bidding Soon
1,502
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 15, 2025

August 14, 2025

Project location map

Multiple Locations, Rosemount, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.