BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 19, 2025 at 8:00 PM

Updated July 22, 2025

Renovation of a mixed-use development in Atlanta, Georgia. Completed plans call for the renovation of a educational facility.

The Atlanta Independent School System is seeking a Construction Manager to complete the following scope of work: construct six (6) new security vestibules and reconstruct eighteen (18) security vestibules. Questions Due Date: Jul 8th 2025, 2:00 PM EDT *Estimate could range from $500,000 to $1,500,000* *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. RFP Number: 25-12035-P-AW If you cannot download these documents, contact the purchasing agent, Alicia White, at alicia.white@apsk12.org Six (6) New Security Vestibules Sitework: 3.1.1 Construct a new Security Vestibule at each location identified below: a. Boyd ES b. Hollis Innovation Academy c. Hope-Hill ES d. Kimberly ES e. M.L. King MS f. Mary Lin ES 3.1.2 Provide access control, cameras, and low-voltage systems as required. 3.1.3 Provide ballistic film on all glass material encompassing the six (6) vestibules named above and as indicated on the plans. 3.1.4 Assure code-compliant egress, hardware, signage, ADA access, etc. 3.1.5 Modify existing building systems as necessary. 3.1.6 Patch, repair, or replace existing finishes to match as necessary. 3.1.7 Modify the existing building automation system (BAS) in support of the new HVAC components and improvements as necessary. 3.1.8 Modify the existing sprinkler system as necessary. 3.1.9 Obtain all City of Atlanta approvals. 3.1.10 Coordinate with the Atlanta Public Schools Safety and Security Commissioning Agent from pre-construction through completion. 3.1.11 All work regarding the identified locations above shall be substantially complete no later than July 10, 2026 Eighteen (18) Existing Security Vestibules Sitework: 3.1.12 Provide ballistic films on all glass material encompassing the existing Eighteen(18) Vestibules are named below. a. Beecher Hills ES b. Bunche MS c. Burgess-Peterson ES d. Connally ES e. Gideons ES f. Harper Archer ES g. Howard MS h. Humphries ES i. Hutchinson ES j. Jackson HS k. Midtown HS l. Barack Obama Academy m. Rivers ES n. Springdale Park ES o. Sylvan Hills MS p. Tuskegee Airman Global Academy q. West Manor ES r. Woodson Park Academy (K-8)

Post-Bid

Educational

$1,500,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
255
Active Projects
110
Bidding Soon
2,241
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 21, 2025

November 1, 2025

Project location map

Multiple Locations, Atlanta, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.