BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 10, 2025 at 8:00 PM

Updated July 11, 2025

Site work and paving for a road / highway in Albany, Minnesota. Completed plans call for site work for a road / highway; and for paving for a road / highway.

In General, Work Consists of the Reclaiming and Resurfacing of the Roadway, and Re-shouldering. The Project Consists of the Following Approximate Quantities: 10,250syreclaim Bituminous Pavement 1,138cycommon Excavation 2,470tnbituminous Pavement Mixture 65cyaggregate Shouldering Along With Traffic Control, Restoration and Related Appurtenances. Bid Security in the Amount of 5 Percent of the Amount of the Bid Must Accompany Each Bid in Accordance With the Instructions to Bidders. The Owner Reserves the Right to Retain the Deposits of the 3 Lowest Bidders for a Period Not to Exceed 60 Days After the Date and Time Set for the Opening of Bids. No Bids May Be Withdrawn for a Period of 60 Days After the Date and Time Set for the Opening of Bids. Direct Inquiries to Engineer's Project Manager Jeremy Mathiasen at (320) 266-5232. Question Deadline 07/03/2025 Any Prime Contractor, Subcontractor, or Motor Carrier That Does Not Meet the Minimum Criteria or Fails to Comply With the Verification Requirements is Not a Responsible Contractor and is Not Eligible to Be Awarded a Construction Contract for the Project or to Perform Work on the Project. A Prime Contractor, Subcontractor, or Motor Carrier That Makes a False Statement Under Oath Verifying Compliance With the Minimum Criteria Will Be Ineligible to Be Awarded a Construction Contract on the Project, and the Submission of a False Statement May Result in Termination of a Contract Awarded to a Prime Contractor, Subcontractor, or Motor Carrier That Submits the False Statement. A Prime Contractor Shall Include in Its Verification of Compliance a List of All of Its First-tier Subcontractors That It Intends to Retain for Work on the Project. Before Execution of a Construction Contract, a Prime Contractor Shall Submit a Supplemental Verification Under Oath Confirming That All Subcontractors and Motor Carriers That the Prime Contractor Intends to Use to Perform Project Work Have Verified to the Prime Contractor, Through a Signed Statement Under Oath by an Owner or Officer, That They Meet the Minimum Criteria for a Responsible Contractor.

Bid Results

Roads / Highways

$281,235.00

Public - City

Paving, Site Work

11

15

6

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
217
Active Projects
115
Bidding Soon
1,333
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2025

August 11, 2025

Project location map

334th St & 253rd Ave, Albany, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.