Published July 10, 2025 at 8:00 PM

Updated July 11, 2025

Site work and paving for a civil project in Palmer, Alaska. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The Matanuska-Susitna Borough is requesting bids from qualified contractors to realign, upgrade and improve the drainage along 1584 linear feet of South Butte Drive. Questions Due Date: Jun 27th 2025, 5:00 PM AKDT Online Portal This project's purpose is to realign, upgrade and improve the drainage along 1584 linear feet of South Butte Drive. This project will involve, but is not limited to, clearing, grubbing, excavation, import and placement of borrow material, import and placement of aggregate base and surface courses, placing hot mix asphalt, installing drainage culverts, and placing topsoil and seed. All construction shall be completed in accordance with the Alaska Department of Transportation and Public Facilities (DOT&PF) Standard Specifications for Highway Construction (SSHC) 2017 Edition. Project specific special provisions are provided in the following sections. The requirements contained in these specifications and special provisions are hereby made a part of this solicitation and resultant contract. o This project is located in Palmer along S Bodenburg Loop. The project may be accessed by heading south 4.2 miles on S Old Glenn Hwy from E Artic Ave. See project location and vicinity maps. o Contractor is to provide resources to complete this project without any adjustments in the original bid amount or contract time. o Work Zone speed limit: Limit speed of vehicles associated with construction to 20 miles per hour within project limits. o Normal work time will be between 7 a.m. and 7 p.m. Extensions will be considered and approved by the MSB Project Manager or Inspector. o The contractor must designate a primary point of contact for public inquiries related to the construction project. The contact person's details must be submitted to the MSB Project Manager within seven (7) days of the contract award. This information will be included in all construction notices distributed to residents in the project area. The designated contact must be accessible during normal business hours, capable of addressing resident concerns, providing updates, and coordinating any project-related issues with the MSB Project Manager. The contractor is responsible for keeping this contact information accurate and up to date for the duration of the project. Any changes must be communicated to the MSB Project Manager within two (2) business days. Additionally, the contractor must ensure that the designated contact is trained and prepared to handle public inquiries effectively, including addressing complaints and providing timely responses. o The Contractor shall provide a proposed construction schedule. The Contractor shall periodically or, as requested, update the schedule. o Alaska DOT&PF Right of Way permit has been acquired. Contractor will be responsible to apply for and procure a lane closure permit from DOT&PF to perform the work within DOT&PF Right of Way. o Contractor shall coordinate the road improvements with all utility relocation work. Request locates from the utilities having facilities in the area. Use the Alaska Digline, Inc. Locate Call Center. See Section 105- 1.06 for digline number and a list of utility companies in the area. For more information call (907) 861-8601 or e-mail purchasing@matsugov.us. Persons needing accommodation in order to participate should contact the borough ADA coordinator at (907) 861-8404.

Award

Roads / Highways

$386,941.00

Public - City

Paving, Site Work

68

5

4

5

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
2
Bidding Soon
148
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 7, 2025

August 6, 2025

Project location map

Butte Dr, Palmer, AK

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.