Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 1, 2025 at 8:00 PM
Updated September 2, 2025
Site work and paving for a civil project in Otterburn Park, Quebec. Completed plans call for site work for a bridge / tunnel; water / sewer project; road / highway; and for paving for a road / highway.
Reference number: 20079526 Deadline for receipt of complaints 2025-07-03 Electronic tender submission accepted No Expected duration of the contract without options (in months) 2 The Town of Otterburn Park wishes to receive tenders for the construction of the new school street in the chemin des Patriotes Sud sector over an approximate length of 185 metres. Without being restrictive, the work can be summarized as follows: 1- Excavation and backfilling ; 2- Storm sewer, culvert and ditch; 3- Street foundation; 4- Two layers of bituminous asphalt and pavement markings; 5- Sidewalk and cement concrete curb; 6- Surface repairs. As well as all related work required to complete this contract. The contractor must proceed diligently and draw up its work schedule taking into account that : a) The contractor has a period of thirty (30) consecutive working days between August 11, 2025 and October 31, 2025 to complete all of the work, with the exception of the work related to paving 2026. b) The contractor has a period of five (5) consecutive working days within the period between the end of the 2026 thaw and June 21, 2026 to complete the work related to 2026 paving. c) The working hours available to the contractor are from 7:00 a.m. to 5:00 p.m., Monday to Friday. d) The contractor is required to take into account any unforeseen circumstances, such as rainy days, waiting times, etc., in his work schedule. In the event of delays, the client reserves the right to take all necessary measures, in accordance with the contract, to protect its interests. The contractor will not be reimbursed for any costs incurred as a result of the delay.
Award
Roads / Highways
$643,133.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 16, 2025
August 11, 2025
Chemin des Patriotes, Otterburn Park, QC
Related To This Project
Otterburn Park, QC
Bid Date: Jul 17 2025
Otterburn Park, QC
Bid Date: Sep 26 2025
Otterburn Park, QC
Bid Date: Sep 22 2025
Otterburn Park, QC
Bid Date: Nov 21 2025
Otterburn Park, QC
--
Otterburn Park, QC
Bid Date: Mar 05 2025
Otterburn Park, QC
Bid Date: Apr 02 2025
Otterburn Park, QC
Bid Date: Apr 17 2024
Otterburn Park, QC
Bid Date: Mar 07 2024
Otterburn Park, QC
Bid Date: Mar 12 2024
Otterburn Park, QC
Bid Date: Feb 26 2024
Otterburn Park, QC
Bid Date: Feb 29 2024
Otterburn Park, QC
Bid Date: Feb 19 2024
Otterburn Park, QC
Bid Date: Feb 14 2022
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
