BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 21, 2025 at 8:00 PM

Updated July 25, 2025

Renovation of a municipal facility in Saskatoon, Saskatchewan. Completed plans call for the renovation of a municipal facility.

The contractor will provide a complete solution for the RPC's rooftop, encompassing design, supply, and installation services for a non-penetrating raised warning line and guardrail system. This includes all necessary fall arrest and restraint equipment, and training for end-users on the safe use of the installed system. Specific requirements include: The entire roof top perimeter of the facility with flat top roofing, excluding portions of all internal courtyards, are maintained with a (non-penetrating) raised warning line. This line will be located a minimum of 2.0 Meter from each edge per regulatory requirements. Any areas where the 2.0 Meters Control Zone limits the travel way, where it does not exist, or where razor wire exists and work tasks are to be undertaken, a section of permanent non-penetrating guardrail system, is installed. 1. Design a compliant, non-penetrating safety system adheres to Canadian Occupational Health and Safety Regulations SOR/86-304, CSA Z259.18:19, and CSA Z259.17:16 (R2020), following CSC's approval. 2. Supply all materials and install a compliant, non-penetrating option for working safely on the roof of the Regional Psychiatric Centre (RPC), covering approximately 5200 feet of rooftop edge. 3. Supply and install all necessary materials. 4. Create and maintain an up-to-date project schedule. 5. Provide their own equipment, tools, and safety equipment. Including any lifts, scaffolding etc. that are required. 6. Dispose of all waste during construction off site and return the surrounding area to pre-work conditions upon completion. 7. Contractor to fully commission the system. 8. Complete a walkthrough with CSC personnel to ensure work has been completed satisfactorily. 9. Fall Arrest and/or Restraint Equipment Supply: Provide all necessary fall arrest and/restraint equipment required for safe work within the designated control zones on the roof. This equipment must meet or exceed all current safety standards and regulations for all protection. 10. User Training: Contractor must be a Fall Protection Training Provider and provide end user training for the complete system, including portable anchor installation and use for access inside the control zones. Documents may be obtained from the Government of Canada Website at: https://canadabuys.canada.ca/en/tender-opportunities

Post-Bid

Municipal

$200,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
20
Bidding Soon
197
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 24, 2025

August 8, 2025

Project location map

Multiple Locations, Saskatoon, SK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.