BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 29, 2025 at 8:00 PM

Updated July 30, 2025

Site work for a water / sewer project in Berea, Kentucky. Completed plans call for site work for a water / sewer project.

*As of July 29, 2025 this project has been awarded to Chasteen Enterprises, Inc. for $213,292.75. Each Bidder must accompany his/her bid with a Bid Bond in amount of not less than five (5) percent of the base bid. No Bidder may withdraw his/her bid for a period of 90 days. The Bidder awarded the contract shall execute a 100% Performance Bond and a 100% Payment Bond and shall furnish insurance as required, in the General Conditions. This This contract consists of installing approximately 5,150 L.F. of 4" and 6" PVC, SDR-17 waterline and all other necessary appurtenances. contract shall be completed within 60 calendar days after date of authorization to start work. Liquidated damages will be $1,000 per calendar day. Any bid that is obviously unbalanced may be rejected. The Southern Madison Water District reserves the right to reject any and all bids and waive informalities. Bidders must have experience with similar type projects in congested areas where multiple utilities are located. A list of references will be requested and thoroughly reviewed. Bidders must comply with the President's Executive Order Nos. 11246 and 11375, which prohibit discrimination in employment regarding race, creed, color, sex, or national origin. Bidders must comply with Section 3, Section 109, Title VI of the Civil Rights Act of 1964, the Anti-Kickback Act and the contract Work Hours Standard Act. Bidders must certify that they do not, and will not, maintain or provide for their employees any facilities that are segregated on a basis of race, color, creed, or national origin. Question Deadline 07/08/2025 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the Bidding Documents. Questions received less than five days prior to the date for opening of Bids may not be answered.

Award

Water / Sewer

$213,293.00

Public - County

Site Work

12

19

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
52
Bidding Soon
713
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 15, 2025

August 14, 2025

Project location map

Multiple Locations, Berea, KY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.