Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 8, 2025 at 8:00 PM
Updated July 9, 2025
Site work and paving for a mixed-use development in Adrian, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
The description of the work is as follows: Part A o N. Winter Parking Lot Addition: (New Pavement) Part B o Scott St - Beecher to Burr (Mill and Resurface) Part C o Island Park: (Mill, Resurface and New Pavement) o Riverside: (Mill and Resurface) o Oakwood Cemetery: (Mill and Resurface) Exact locations are available via email to barmstrong@adrianmi.gov A certified check or bidder's bond in an amount equal to five percent (5%) of the total amount of the proposal will be required to accompany the proposal. A performance bond, maintenance guarantee bond, and labor/materials bond for 100% of the amount of the Contract will be required. The right to accept any proposal, to reject any or all proposals and to waive any irregularities in any proposal is reserved by the City of Adrian. All measurements are approximate and must be field verified and agreed to by the Project Engineer prior to consideration for payment. Exact locations are available via email to barmstrong@adrianmi.gov. 2. Parking Lots shall be paved as specified in the HMA Application Estimate, attached. 3. All paving limits will be clearly marked by the Engineer prior to commencement of work. In most cases the milling will NOT be continuous through intersections of streets unless otherwise directed by the Engineer. 4. The City shall provide a dump site where all millings shall be hauled, dumped, and remain the property of the City of Adrian. No millings shall be sold to private parties or hauled to any location other than the site provided by the City o N. Winter Parking Lot (New Pavement) 36,300 sqft o Scott St - Beecher to Burr (Mill and Resurface) o Island Park: (Mill, Resurface and New Pavement) o Riverside: (Mill and Resurface) o Oakwood Cemetery: (Mill and Resurface) 450' x 10' N. Winter Parking Lot Scope of Work The contractor must perform finish fine grade to the compacted base before paving. The costs shall be provided in the HMA line item. The City will get within a few inches to final grade then it is expected that the contractor will get to finish grade. This is scheduled for 2 lifts totaling 3 inches (3") of 5E1. Scott St Scope of Work Thisis scheduled for 2 inches(2") HMA Cold Milling with 2 inches(2") of 5E1. Section is near railroad and state route. Necessary permits have already been obtained by the City. Proper signage will required and shall be at the expense of the contractor. Island Park Scope of Work Said section will consist of placing new pavement as well as milling and resurfacing portions. The contractor must perform finish fine grade to the compacted base before paving the new pavement sections. The costs shall be provided in the HMA line item. The City will get within a few inches to final grade then it is expected that the contractor will get to finish grade. New pavement sections are scheduled for 1 lift totaling 2 inches (2") of 5E1. Mill and resurfacing sections are scheduled for 2 inches (2") HMA Cold Milling with 2 inches (2") of 5E1. Riverside Park Scope of Work Said section will consist of milling and resurfacing portions. These sections are scheduled for 2 inches (2") HMA Cold Milling with 2 inches (2") of 5E1. Oakwood Cemetery Scope of Work Said section is scheduled for 2 inches (2") HMA Cold Milling with 2 inches (2") of 5E1.
Bid Results
Roads / Highways
$121,701.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 3, 2025
August 4, 2025
Multiple Locations, Adrian, MI
Related To This Project
Adrian, MI
Bid Date: Jul 10 2025
Adrian, MI
Bid Date: Aug 06 2025
Adrian, MI
Bid Date: Aug 13 2025
Adrian, MI
Bid Date: Jul 29 2025
Adrian, MI
Bid Date: Aug 20 2025
Adrian, MI
Bid Date: Sep 05 2025
Adrian, MI
Bid Date: Mar 28 2019
Adrian, MI
Bid Date: Nov 13 2025
Adrian, MI
Bid Date: Jul 11 2025
Adrian, MI
Bid Date: May 22 2025
Adrian, MI
Bid Date: May 27 2025
Adrian, MI
Bid Date: May 27 2025
Adrian, MI
Bid Date: May 23 2025
Adrian, MI
Bid Date: May 15 2025
Adrian, MI
Bid Date: May 08 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
