BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 7, 2025 at 8:00 PM

Updated August 8, 2025

Site work for a development in Plum, Pennsylvania. Completed plans call for site work for a development.

Question Deadline 07/02/2025 at 4:00 PM ET Questions through Online Portal Bids are requested for the following Contract: Meadow Hill Village Detention Pond Retrofit. Plum Borough will receive bids for the Meadow Hill Village Detention Pond Retrofit project in Plum Borough. The Project includes the following Work: The work to be completed includes clearing and grubbing as well as retrofit work on one stormwater retention pond located within the Meadow Hill Village housing plan on Lee Ann Court in Plum Borough. Retrofit activities on the pond include establishing a path/route to basin gate, removal and hauling of sediment from the bottom of the basin, retrofit existing stormwater structures in the pond, placing amended soil mix and seeding. Please refer to drawings for additional information. A pre-bid conference will not be held for the Project. Instructions to Bidders. Bid security in the form a Certified Check or Bid Bond shall be furnished with the bid in an amount not less than 10%. All questions about the meaning or intent of the Bidding Documents are to be submitted via online in accordance with the Instructions to Bidders. Telephone inquiries are unacceptable. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. Statutory Requirements. The Borough of Plum reserves the right to waive any defects, errors, omissions, mistakes, informalities, to accept any bid or combination of bids that are deemed to be in the best interest of the Borough of Plum, and to reject any or all proposals. Estimated Contract Value: $50,000 - $100,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Conservation and Development

$84,500.00

Public - City

Site Work

4

16

3

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
216
Active Projects
101
Bidding Soon
1,554
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2025

August 8, 2025

Project location map

Multiple Locations, Plum, PA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.