Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 16, 2025 at 8:00 PM
Updated July 17, 2025
Site work and paving for a mixed-use development in Allen Park, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
0.51 mi of hot mix asphalt cold milling and resurfacing, curb ramps, concrete base repair, signing and pavement markings on Allen Road from Southfield Road (M-39) northeasterly to Euclid Avenue in the city of Allen Park, Wayne County. This is a Local Agency project. 5% DBE Participation Required Net classification required for this project is 1697 Cb In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of Ba. If the prime contractor is not prequalified in this subclassification it must use a prequalified subcontractor. This subcontractor must be designated prior to award of the contract to the confirmed low bidder. Control Sec Job No Federal No STU 82000 221846A 25A0702 Completion Date: 5/15/2026 MIDOT - 2507 055 - Hot Mix Asphalt Cold Milling and Resurfacing, Curb Ramps, Concrete Base Repair, Signing and Pavement Markings
Award
Roads / Highways
$1,424,299.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 11, 2025
September 9, 2025
Allen Rd, Allen Park, MI
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
