BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 25, 2025 at 8:00 PM

Updated July 11, 2025

Site work and new construction of an elderly care / assisted living facility in Trail, British Columbia. Completed plans call for the construction of a 30,407-square-foot, three-story above grade, 41-unit elderly care / assisted living facility; and for site work for a elderly care / assisted living facility.

Trail & District Seniors Citizens' Villa Society has teamed up with City Spaces Consulting and North Mountain Construction to deliver a 41-unit seniors' housing complex at 1955 Seventh Avenue in Trail, BC. The new facility will replace the existing housing buildings. The proposed building is a wood framed, 3-storey, 30,407 square foot complex with 41 one bedroom suites including fully accessible units. Trail & District Seniors Citizens' Villa Society is the Owner. City Spaces is the Owner's housing consultant overseeing the delivery of the project. North Mountain Construction is the Construction Manager for the project. The following tender opportunities exist for this project: Concrete Formwork Flooring / Tile Concrete Reinforcing Vinyl Deck Membrane Concrete Finishing Painting Concrete Pumping Specialties Concrete Slab Prep Wall/Corner Protection Foundation Treatments / Waterproofing Washroom Accessories Gypcrete Toppings Mailbox Misc Metal Fabrications / Handrails Bike Racks Aluminum Deck Guardrails Closet Organization Wood Framing Floor Mats Joist, Truss & Eng. Lumber Supply Signage Misc Finish Carpentry Tasks Appliances Millwork Window Coverings Cladding, Soffits & Trim Passenger Elevator Insulation & Poly Mechanical & Fire Suppression Membrane Roofing Electrical, Comms, Controls, Fire Alarm, Access Control, Security Firestopping Civil Earthworks Aluminum Storefronts & Glazing Asphalt Paving Doors, Frames & Hardware Site Concrete Vinyl Windows & Patio Doors Landscaping & Fencing Drywall & Acoustical Ceilings Piped Utilities Project Start On-Site: Fall 2025 Substantial Completion: Spring 2027 Please contact Dave Elliott at dave@northmountainconstruction.ca at North Mountain Construction to obtain the bid documents. Questions Deadline: July 2nd, 2025 2:00pm PT

Post-Bid

Elderly Care / Assisted Living

$15,000,000.00

Public - State/Provincial

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
14
Bidding Soon
111
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2025

September 1, 2025

Project location map

1955 7 Ave, Trail, BC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.