Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 8, 2025 at 8:00 PM
Updated August 9, 2025
Site work and renovation of a civil project in Parkville, Missouri. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
The pre-bid conference will include a tour of the subject installations. For viewing of the sites at other times, bidders may access via public road rights-of-way. Bidders are encouraged to direct questions to the Engineer via e-mail. The project consists of repairs to two existing wastewater pumping stations and including the following general work items: setting temporary control panels, removing and replacing control panels and components, constructing and modifying terminal boxes, modifying conduit and wire, pouring small concrete slabs for terminal boxes, installing new variable frequency drives, and related work. A. Contract Type: Unit Price, as set forth in the Bid Form and Agreement Description of Work under this Contract: Improvements, repairs and rehabilitation ofthe PLATTE COUNTY REGIONAL SEWER DISTRICT sanitary sewer system will generally include the following: 1. Making repairs to two existing wastewater pumping stations and including the following general work items: setting temporary control panels, removing and replacing control panels and components, constructing and modifying terminal boxes, modifying conduit and wire, pouring small concrete slabs for terminal boxes, installing new variable frequency drives, and related work. A. The AC Drive shall convert the input AC mains power to an adjustable frequency and voltage, to provide microprocessor-based control for three-phase induction motors. B. The input power section shall utilize a full wave bridge design incorporating diode rectifiers. The diode rectifiers shall convert fixed voltage and frequency, AC line power to fixed DC voltage. C. The output power section shall change fixed DC voltage to adjustable frequency AC voltage. D. The adjustable frequency drive package shall include input EMI/RFI filtering. E. The AC drive shall have a user interface (keypad) that presents information in plain English text. The user interface shall include a Local / Remote button to switch between control at the terminal strip and the user interface (keypad). This button shall also switch between network control and the user interface (keypad). The keypad shall have Run and Stop keys and a manual speed potentiometer function.
Bid Results
Water / Sewer
$266,682.00
Public - County
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 22, 2025
August 21, 2025
Multiple Locations, Parkville, MO
Related To This Project
Parkville, MO
Bid Date: Jan 30 2026
Parkville, MO
Bid Date: Jun 03 2025
Parkville, MO
Bid Date: May 28 2025
Parkville, MO
Bid Date: Apr 11 2025
Parkville, MO
Bid Date: Oct 15 2021
Parkville, MO
Bid Date: Apr 29 2025
Parkville, MO
Bid Date: Feb 11 2025
Parkville, MO
--
Parkville, MO
--
Parkville, MO
Bid Date: Mar 01 2021
Parkville, MO
Bid Date: Oct 23 2024
Parkville, MO
Bid Date: Sep 11 2024
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
