BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 2, 2025 at 8:00 PM

Updated September 3, 2025

Site work and paving for a mixed-use development in Slatington, Pennsylvania. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The scope of work includes mill/overlay, full depth pavement replacement, ADA ramps, sidewalks and curbing. INTRODUCTION: This Project Manual is comprised of all forms and documentation needed for the project described herein. Each of the forms listed below is considered a separate chapter of this Project Manual. As a general rule, the chapters are arranged in the chronological order in which they are to be needed. For example, Chapter A- Invitation to Bidders is necessarily first since a potential contractor will need to read the Invitation prior to considering whether he/she/it wishes to acquire Chapter B - Instructions to Bidders for purposes of completing Chapters C through G. Likewise, only after receipt of items C through G, can the Borough of Slatington determine the party, scope of work, and amounts to be set forth in Chapter H - Notice of Award and subsequent forms. The forms/chapters listed below are set forth in the following pages in the order listed. For the sake of clarity, each chapter is identified in the footer of every page and every page is numbered sequentially within each chapter. There is no page numbering system for Project Manual as a whole, but only for each chapter. Questions Due Date: Jul 3rd 2025, 12:00 PM EDT. The Bid for the Slatington Willow Ave. Improvements, Slatington, PA 18080 (PROJECT) shall be accompanied by a Bid Security in the amount of ten percent (10%) of the total amount of the Bid in the form of a certified check, bank money order, or bid bond. All Bids shall be effective for sixty (60) calendar days from the date of the Bid opening, unless an award of the contract is delayed by the required approval of another government agency, the sale of bonds or the award of a grant, in which case all bids shall remain effective for one hundred twenty (120) calendar days from the date of the Bid opening. On or before the last day during which bids shall be effective, if a contract will be awarded it shall be awarded to the lowest responsible bidder. After issuance of the Notice of Award, such contract must be completed within 60 calendar days from the date of the Notice to Proceed. The successful bidder will be required to provide Construction Performance and Payment Bonds equal to 100% of the contract amount as specified in the contract documents, which bonds shall also cover a 1-year correction period which will commence upon completion of the Work. OWNER reserves the right to accept or reject any or all Bids or portions thereof. Return comments and questions to: Abigail Bartels, EIT Project Manager for Borough of Slatington 2633 Moravian Avenue Allentown, PA 18103 abartels@acela-ae.com

Award

Roads / Highways

$94,603.00

Public - City

Paving, Site Work

7

15

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
572
Active Projects
75
Bidding Soon
4,080
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 8, 2025

August 7, 2025

Project location map

Willow Ave, Slatington, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.