Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 8, 2025 at 8:00 PM
Updated September 9, 2025
Site work and paving for a transportation facility in Greenville, South Carolina. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.
**As of September 08, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** Base Bid involves all demolition, erosion control, fencing, grading, drainage, paving, airfield electrical, and pavement marking for airfield improvements for Runway 19 end of the airfield. Work involves partial relocation and realignment of Taxiways A, A7 and A8, partial extension of Taxiway B and fillet widening of Taxiway B5. Additive bids include a new dry detention basin and a new 60kW diesel emergency generator. Construction Cost Range: $2,500,000 to $5,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Questions of a technical nature should be directed electronically via email to kmorris@holtconsultingco.com. Question Deadline 07/17/2025 All questions about the meaning or intent of the Contract Documents shall be submitted to ENGINEER in writing. Questions received less than seven (7) days prior to the date of opening of Bids will not be answered. PN - SC0701-16
Bid Results
Transportation Terminals
$3,858,393.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 24, 2025
September 15, 2025
100 Tower Dr, Greenville, SC
Related To This Project
Greenville, SC
Bid Date: Jul 16 2025
Greenville, SC
Bid Date: Aug 10 2021
Greenville, SC
Bid Date: Jul 15 2025
Greenville, SC
Bid Date: Aug 22 2025
Greenville, SC
--
Greenville, SC
Bid Date: Aug 01 2025
Greenville, SC
Bid Date: Jun 17 2025
Greenville, SC
--
Greenville, SC
Bid Date: Jul 03 2025
Greenville, SC
Bid Date: Jul 15 2025
Greenville, SC
--
Greenville, SC
Bid Date: Jun 18 2025
Greenville, SC
Bid Date: Jun 18 2025
Greenville, SC
Bid Date: Jun 10 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
