Published September 3, 2025 at 8:00 PM
Updated September 4, 2025
Renovation of a multi-residential development in Pascagoula, Mississippi. Working plans call for the renovation of a multi-residential development.
**As of August 22, 2025, this project has not yet been awarded. The project is expected to be awarded on August 28, 2025.** The Mississippi Regional Housing Authority VIII d/b/a South Mississippi Housing Authority is now accepting proposals for LVP installation at Pecan Chateau, Chateau Oaks, Myrtle Grove Pointe and Lexington Pointe, which are located in George and Jackson County. To request a proposal packet, please e-mail procurement@mrha8.org. All questions should be submitted in writing to procurement@mrha8.org by 11:00 AM CST on July 15, 2025. Chateau Oaks: 2113 Alex Street Pascagoula, MS 39567 Lawana- 228-762-6181-Area Property Manager-chateau.oaks@mrha8.org Derek- 228-669-7796- Maintenance Myrtle Grove Pointe 4324 Peters Street Moss Point, MS 39563 Krystal- 228-234-9579- Property Manager- myrtle.grove@mrha8.org Steven-228-382-0080-Area Maintenance Supervisor- steven.sawyer@smha8.org Lexington Pointe 3705 Lexington Street Pascagoula, MS 39567 Krystal-228-762-0072- Property Manager- lex.pointe@mrha8.org Chris- 228-236-5546- Maintenance Pecan Chateau 800 Pecan Circle Lucedale, MS 39452 Jennifer- 601-258-0720- Property Manager-pecan.chateau@mrha8.org Randy- 228-236-6090- Maintenance LVP flooring: Work shall include, but not be limited to, the following: 1. Install all plank flooring with new transition strips as required at the doorways, bedrooms, and closets. After the existing flooring has been removed, the contractor will need to ensure the flooring is level and no gaps before installing the new flooring. 2. Baseboards will not be removed or lowered to fill gap, quarter round (Primed) will be used and if gap is too large for quarter round then a 1x2 (Primed) will be placed against the baseboard and flush with the floor to fill gap. 3. Due to the manufacturer's delays, we are requesting multiple flooring options. Option 1- Mohawk- Westward 2.0, color selection Juneau 812. If you are unable to purchase this flooring, we will consider a similar product and color. (Owner Approved) The contractor must field verify all measurements. SMHA will not be responsible for incorrect pricing submitted due to lack of verifying measurements. The contractor will have no more than two (2) SMHA workdays to respond to the property manager's request and must complete the flooring within two (2) SMHA working days. If the contractor does not respond to the property manager's request within two (2) SMHA working days, the Property Manager reserves the right to move to the next contractor in the rotating pool. The property manager reserves the right to extend the number of days on a unit, if necessary. The contractor must perform these services during normal SMHA working hours, which are typically Monday through Friday 8 AM to 4 PM. Please check with each property manager to determine the exact hours of operation per location. No work will be completed on weekends or holidays.
Final Planning
Multi-Residential
$300,000.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 5, 2025
September 4, 2025
Multiple Locations, Pascagoula, MS
Related To This Project
Pascagoula, MS
Bid Date: Aug 13 2025
Pascagoula, MS
Bid Date: Nov 12 2025
Pascagoula, MS
Bid Date: Aug 28 2025
Pascagoula, MS
Bid Date: Aug 26 2025
Pascagoula, MS
Bid Date: Aug 11 2021
Pascagoula, MS
Bid Date: Aug 27 2025
Pascagoula, MS
Bid Date: Sep 23 2025
Pascagoula, MS
Bid Date: Sep 24 2025
Pascagoula, MS
Bid Date: Jun 18 2025
Pascagoula, MS
Bid Date: Jul 09 2025
Pascagoula, MS
Bid Date: May 15 2025
Pascagoula, MS
Bid Date: Jan 28 2021
Pascagoula, MS
Bid Date: May 20 2025
Pascagoula, MS
Bid Date: May 22 2025
Pascagoula, MS
Bid Date: Apr 16 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.