Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 23, 2025 at 8:00 PM
Updated July 24, 2025
Site work and paving for a road / highway in Austin, Texas. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Intent of Plans and Specifications It is the intent of the plans and specificationsto describe a completed work to be performed underthe contract. Unless otherwise provided, the Contractor must furnish all materials, supplies, tools, equipment, supervision, and labor necessary for the proper prosecution and completion of the work. Reference Number 0000387092 Question Deadline 07/08/2025 at 5:00 PM CT Questions are submitted online Yes Bid Intent Not Available Performance Period: 365 Calendar Days Liquidated Damages: See General Conditions of the Construction Contract, Item 8, Section 8.6 Failure to Complete Work on Time It is understood that Travis County reserves the right to reject any and all Responses and to make award of a base response and/or an alternate response which is in the best interest of Travis County. It is further understood that the Response may not be modified or withdrawn for ninety (90) calendar days from the date of Response opening. 1. The successful Contractor shall provide two coats of High Density Mineral Bond (HDMB) to the roads listed for this contract. 2. Contractor to crack seal pavement before High Density Mineral Bond installation. 3. Contractor shall be responsible for all traffic control during the project. 4. Contractor will meet with the Travis County Engineering Staff to agree upon a construction schedule and road closure plan. 5. Contractor shall be responsible for transportation of residents from their homes to a designated parking area during the drying stage, if necessary. 6. Contractor will coordinate with the Waste Management to maintain garbage pickup services. 7. Contractor will prepare and distribute a flyer to the affected residents with contact numbers to request transportation three (3) days in advance of the project beginning. 8. The Contractor will supply a general information letter to the affected residents of the project 7 to 14 days in advance of the project. 9. Contractor shall re-stripe stop-bars and crosswalks.
Post-Bid
Roads / Highways
$650,000.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 21, 2025
August 20, 2025
700 Lavaca St, Austin, TX
Related To This Project
Austin, TX
--
Austin, TX
--
Austin, TX
--
Austin, TX
--
Austin, TX
--
Austin, TX
--
Austin, TX
Bid Date: Jul 17 2025
Austin, TX
Bid Date: Jul 18 2025
Austin, TX
--
Austin, TX
--
Austin, TX
Bid Date: Jun 26 2025
Austin, TX
Bid Date: Jul 10 2025
Austin, TX
--
Austin, TX
Bid Date: Jul 15 2025
Austin, TX
Bid Date: Jul 14 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
