BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 7, 2025 at 8:00 PM

Updated July 9, 2025

Site work and paving for a mixed-use development in Russellville, Missouri. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; playground / park / athletic field; and playground / park / athletic field.

Contractor shall provide all labor,materials, equipment, and permitsto complete asphalt paving for the following five (5) locations: 1. Elementary School Parking Lot Current Condition: Gravel/chat surface Required Work: Full asphalt paving 2. High School Parking Lot Current Condition: Concrete surfaceRequired Work: Asphalt overlay 3. Football Field and Track AccessDrive & Parking Lot Current Condition: Gravel/chat surface Required Work: Full asphalt paving 4. Baseball/Softball Complex (125feet by 125 feet) Current Condition: Gravel/chat surface Required Work: Asphalt paving withcurb 5. Parking Area Across from Elementary Current Condition: Grass surface Required Work: Asphalt paving withcurb The District reserves the right to ac-cept or reject any proposal, waive technicalities, or negotiate terms inthe best interest of the District. The District may issue amendmentsor clarifications prior to the proposaldeadline. Any changes will be sharedwith all registered vendors via official addenda, which will take precedence over the original RFP content.Addenda will typically be issued atleast three (3) days before the proposal deadline. Insurance & Liability: The selected contractor shall indemnify and hold harmless the ColeCounty R-I School District from allclaims, liabilities, and damages, including those due to negligence. Site Access & Cleanup: Upon request, vendors may inspectsites. Vendors are responsible forrestoring any disturbed areas totheir original condition following inspections. All inquiries regarding this RFPshould be directed to: Dr. Jeff Jennewein, Superintendent Phone: (573) 782-3534 Email: jjennewein@coler1indians.org The District reserves the right to accept or reject any proposal, waivetechnicalities, or negotiate terms inthe best interest of the District.

Post-Bid

Sidewalks / Parking Lot

$200,000.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
47
Bidding Soon
577
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 7, 2025

August 6, 2025

Project location map

Multiple Locations, Russellville, MO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.