BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 9, 2025 at 8:00 PM

Updated July 23, 2025

This is a service / maintenance or supply contract in Everett, Washington. Contact the soliciting agency for additional information.

a contractor to repair or replace existing ADS® brand combined storm and sewer flow monitoring meters at various locations throughout the City to ensure the reliability of data used for City sewer system monitoring, conveyance, and treatment facility operations for the City Public Works Department. Examples of required services may include service calls for repairs, repairs to existing systems, and urgent repair services extending beyond scheduled or planned maintenance and repair. The city will be the sole determiner of whether the work requested meets the needs and requirements of this contract.

Post-Bid

Water / Sewer

Public - City

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
203
Active Projects
87
Bidding Soon
1,924
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 22, 2025

August 21, 2025

Project location map

Multiple Locations, Everett, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.