Site work for a water / sewer project in Monroe, Connecticut. Completed plans call for site work for a water / sewer project.
All inquiries shall be submitted not less than ten (10) days prior to the Response Deadline. The work under this contract consists of storm drainage pipe replacement of the existing corrugated metal pipe (CMP) and replacement of the storm drainage pipe with Plastic pipe (HDPE) of the same size and installed to the existing lines and grades from the catch basin structure locations listed in the table below. Additional work under this contract consists of the removal and replacement of existing catch basin frame and grates with new catch basin frames and grates of the type specified located on the list of roadways below. Prior to construction, town forces will field verify the storm drainage replacement limits and catch basin rehabilitation locations with the contractor. The work under this contract is a portion of a town administered pavement rehabilitation program performed by a State of Connecticut Vendor In-Place Bid contractor and must be completed in advance of the commencement of any full depth reclamation or milling and paving operations. Coordination with the Town Liaison and scheduling will be essential. The work under this Contract shall commence on or around June 30, 2025, or on the date ordered by the Engineer in the Notice to Proceed. All contract work shall be completed within 75 calendar days of the start date listed in the Notice to Proceed. Contract work on the road listed below shall be completed sequentially on or before the dates specified in order to meet the Town of Monroe roadway paving schedule. DATE October 31, 2025 25% SBE and 6.25% M/W/DBE Storm Drainage and Catch Basin Rehabilitation This contract is subject to state set-aside and contract compliance requirements, including set aside (25% SBE and 6.25% M/W/DBE) and nondiscrimination requirements enforced by the CHRO.
Post-Bid
Water / Sewer
$60,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 30, 2025
August 6, 2025
To Be Determined, Monroe, CT
Related To This Project
Monroe, CT
Bid Date: Oct 29 2025
Monroe, CT
Bid Date: May 19 2025
Monroe, CT
Bid Date: May 19 2025
Monroe, CT
Bid Date: Apr 23 2025
Monroe, CT
Bid Date: Oct 09 2024
Monroe, CT
--
Monroe, CT
Bid Date: Aug 14 2024
Monroe, CT
--
Monroe, CT
Bid Date: Feb 29 2024
Monroe, CT
--
Monroe, CT
Bid Date: Nov 01 2023
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.