Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 21, 2025 at 8:00 PM
Updated August 22, 2025
Site work for a civil project in Fort White, Florida. Working plans call for site work for a water / sewer project.
As of August 21,2025 project is on hold. No definite date for the rebid. Fort White Phase 1 Wastewater System: Contract A - Wastewater Collection Deadline for Questions: Thursday, July 17, 2025, 5:00 PM Submit Questions: Carrie Schaper clerk@fortwhitefl.com Project Description: This Project includes constructing a Wastewater Collection System and a Wastewater Treatment Plant under separate contracts, titled "Contract A" respectively. The Work includes all clearing, earthwork, trenching, and constructing a gravity sewer system, lift stations, force mains, and wastewater treatment and sprayfield disposal facilities, as denoted in the Plans. PURPOSE A. The purpose of this Specification is to generally outline the work contemplated for the painting and protective coating work performed for the Town of Fort White, including Contract Operations, Capital Improvement Projects, and Developer Contributed Assets as defined under Scope below; together with the General Conditions, Special Provisions and all other Technical Specifications included herewith. All paints and materials used on interior tank or treatment unit surfaces shall conform to AWWA and/or Florida Department of Environmental Protection (FDEP) regulations as they may apply to potable water or wastewater service. The manufacturer furnishing the coating material may be required to furnish certification to the ENGINEER/OWNER that the materials meet these provisions. 1.3 DESCRIPTION A. The extent of painting work is shown on Project Drawings, contracts and schedules, and as specified herein. B. The work includes painting and finishing of interior and exterior exposed items and surfaces throughout the project, except as otherwise specified or shown on Project Drawings. 1. Surface preparation, priming and coats of paint specified are in addition to shop-priming and surface treatment specified under other sections of the work. C. The work includes field painting of exposed bare and covered pipes and ducts including color coding, and of hangers, exposed steel and iron work, tanks, vessels, and primed metal surfaces of equipment installed under the mechanical and electrical work, except as otherwise indicated
Final Planning
Water / Sewer
$3,867,228.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 28, 2025
August 27, 2025
Multiple Locations, Fort White, FL
Related To This Project
Fort White, FL
Bid Date: Jul 28 2025
Fort White, FL
Bid Date: Oct 09 2025
Fort White, FL
Bid Date: Jun 23 2025
Fort White, FL
Bid Date: Apr 28 2025
Fort White, FL
Bid Date: Mar 03 2025
Fort White, FL
Bid Date: Mar 10 2025
Fort White, FL
Bid Date: Nov 05 2024
Fort White, FL
Bid Date: May 14 2024
Fort White, FL
Bid Date: Jan 16 2024
Fort White, FL
Bid Date: Jan 18 2024
Fort White, FL
Bid Date: Jan 20 2022
Fort White, FL
Bid Date: Sep 03 2019
Fort White, FL
Bid Date: Jan 30 2024
Fort White, FL
--
Fort White, FL
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
