BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 4, 2025 at 8:00 PM

Updated September 5, 2025

Renovation of a clubhouse / community center in Fuquay Varina, North Carolina. Conceptual plans call for the renovation of a clubhouse / community center.

Update:South Park Community Center (Construction) Project is included in Town of Fuquay-Varina Fiscal Year 2026-2030 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- After firm selection, the selected Architect(s) will be responsible for performing the basic architectural and engineering services that the Town will further specify during contract negotiations. The contract agreement will provide payment for phases of work completed, with options, to proceed through all phases, or to discontinue work as the circumstances may dictate. Upon selection of a Respondent, with whom negotiations will proceed, the Town and Respondent will develop a scope of work. The Town anticipates a contract which will include schematic design, production of computer-generated renderings, and cost estimation; however, the Town reserves the right to include additional project elements in the initial or subsequent professional services agreement as the Town may (in its sole discretion) deem appropriate. The Architect(s) will be required to retain, and be responsible for, all basic engineering disciplines such as mechanical, electrical, plumbing, fire protection, interior design, landscape architecture, civil engineering, acoustics/sound dampening, and structural engineering as appropriate for the scope of work negotiated. The Architect(s) must identify and select the appropriate sub consultants; however, the Town reserves the right to approve proposed sub-consultants that will be associated with the project Review/Evaluation of Submittals: July 21 - August 1, 2025 Selected Firm Interviews: August 11 - 15, 2025 Contract negotiations: September 2 - 12, 2025 Contract award: September 16, 2025

Conceptual

Clubhouse / Community Centers

$2,000,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
238
Active Projects
149
Bidding Soon
1,756
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2028

Project location map

820 S Main St, Fuquay Varina, NC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.