Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 21, 2026 at 8:00 PM
Updated May 20, 2026
Renovation of an industrial development in Gwinn, Michigan. Completed plans call for the renovation of a industrial development.
The Work includes, but is not necessarily limited to, the removal of replacing the existing EPDM roofing membrane at the Office Area, remove unused roof curbs, provide roof access ladder(s), provide electrical power upgrades in the warehouse/storage area, upgrade to LED lighting in the warehouse/storage area, revise the existing restrooms to accommodate separate men's and women's facilities, remove the existing (unused) building entrance and vestibule, provide HVAC upgrades in the office area, and convert the existing dry fire suppression system to a wet system. 5% BID SECURITY REQUIRED. Please do not submit online questions via electronically. ALL questions should be emailed to Reid Anderson at randerson@upea.com no later than 12:00 p.m., Eastern on March 4, 2026. (a). Remove unused roof curbs & replace existing EPDM roofing membrane. Provide electrical power upgrades in the warehouse / storage area. Upgrade to LED lighting in the warehouse / storage area. Revise existing restrooms to accommodate separate unisex facilities. Remove existing (unused) building entrance & vestibule and create a new break room. Miscellaneous hydronic heating modifications. Relocate existing unit heaters. Add hydronic heating system with glycol feeder. Replace hydronic heating system expansion tank to larger size. Minor non-electric temperature controls. Minor ductwork modification and grille relocation. Remove abandoned HVAC. Minor demolition of abandoned plumbing. Remove unused eye washing station and piping. Relocate existing breakroom grille. New restroom plumbing fixtures. Minor fire suppression modifications to sprinkler heads. Egress lighting upgrades. General lighting upgrades. Existing power panel relocations. Remove abandoned wiring. Improve electrical safety conditions. Exterior lighting upgrades. Convert the existing dry fire suppression system to a wet system.
Post-Bid
Industrial
$650,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 11, 2026
April 10, 2026
416 Ave C, Gwinn, MI
Related To This Project
Gwinn, MI
Bid Date: Mar 06 2026
Gwinn, MI
Bid Date: Jul 15 2025
Gwinn, MI
Bid Date: May 08 2025
Gwinn, MI
Bid Date: May 14 2025
Gwinn, MI
Bid Date: May 01 2025
Gwinn, MI
--
Gwinn, MI
Bid Date: May 14 2025
Gwinn, MI
Bid Date: Apr 30 2025
Gwinn, MI
Bid Date: Apr 30 2025
Gwinn, MI
Bid Date: Apr 22 2025
Gwinn, MI
Bid Date: Mar 14 2025
Gwinn, MI
Bid Date: May 04 2021
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
