BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 4, 2025 at 8:00 PM

Updated August 8, 2025

Site work for a water / sewer project in Clarksburg, Missouri. Completed plans call for site work for a water / sewer project.

CLARKSBURG WASTEWATER SYSTEM IMPROVEMENTS Bidders are informed that pursuant to Section 285.530, RSMo, as a condition of the award, the successful Bidder shall, by sworn affidavit and provision of documentation, affirm its enrollmentand participation in a federal work authorization program with respect to the employees working in connection to the contracted services. Successful Bidder shall sign an affidavit affirming that it does not knowingly employ any person who is an unauthorized alien in connection to the contracted services. All bids shall reflect payment of not less than State of Missouri prevailing wage to be paid to all workers performing work under this contract in accordance with all requirements of Sections 290.010 through 290.580 RSMo. Question Deadline 07/24/2025 All contractors or subcontractors doing work on the Project must require its on-site employees to complete the ten-hour construction safety training program required under Section 292.675, RSMo, unless they have previously completed the program and have documentation of having done so. Documents Notes CONTRACT DOCUMENTS may be viewed at the offices of the City of Clarksburg, Missouri, Bartlett & West, and American Document Solutions. The CONTRACT DOCUMENTS are also available to view online Each bidder must deposit with his bid security in the amount, form and subject to the conditionsprovided in the "Instructions to Bidders." No bidder may withdraw their bid within 90 days after the actual date of the opening thereof. Bidders are informed that the owner reserves the right to waive any informalities or to reject any and all bids. The PROJECT has been financed through the Missouri State Revolving Fund, established by the sale of Missouri Water Pollution Control bonds and federal Capitalization Grants to Missouri.) & Remove Doc note Bidders on this work will be required to comply with the President's Executive Order Number 11246. Requirements for bidders and contractors under this order are explained in the specifications. Attention of bidders is particularly called to the requirements as to conditions of employment to be observed and Davis Bacon and/or State Prevailing wage rates to be paid under the contract, Segregated Facility, Section 109, and E.O. 11246. MBE, WBE and Section 3- DBE bidders are encouraged to bid.

Post-Bid

Water / Sewer

$1,831,500.00

Public - City

Site Work

80

20

10

5

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
100
Active Projects
60
Bidding Soon
568
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 7, 2025

November 10, 2025

Project location map

Multiple Locations, Clarksburg, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.