Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 28, 2025 at 8:00 PM
Updated July 29, 2025
Site work and paving for a bridge / tunnel in Daleville, Alabama. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Dale County Contract Time: 60 Working Days for constructing the Bridge Deck Rehabilitation (Hydro Demo) and Painting on SR-12 (US-84) (Eastbound Roadway) over the Choctawhatchee River southeast of Daleville. Length 0.094 mi. The Bracket Estimate on this project is from $865,745 to $1,058,132 . If further clarification is needed, please contact the Plans and Proposals Section of the Bureau of Office Engineer with any questions you may have. We strongly encourage you to e-mail us at offengr@dot.state.al.us. We will work with you to resolve any issues. The total amount of uncompleted work under contract to a contractor must not exceed the amount of his or her qualification certificate. Minimum Wage Rates have been pre-determined by the Secretary of Labor and are set forth in the advertised specifications. Federal Aid Projects are also subject to the contract work hours and Safety Standards Act and its implementing regulations. Cashier's check or bid bond for 5% of bid (maximum - $50,000.00) made payable to the Alabama Department of Transportation must accompany each bid as evidence of good faith. The Alabama Department of Transportation, proposals will be issued only to prequalified contractors or their authorized representatives, upon requests that are received before 10 AM., on the day previous to the day of opening of bids. The bidder's proposal must be submitted on the complete original proposal furnished him or her by the Alabama Department of Transportation. The right to reject any or all bids is reserved. ALDOT - Call Order 004 - Bridge Replacement and Approaches (Grading, Draining, Paving and Bridge Removal) on SR-53 (US-231) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Bid Results
Bridges / Tunnels
$897,368.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 25, 2025
September 23, 2025
Eastbound Roadway, Daleville, AL
Related To This Project
Daleville, AL
Bid Date: Oct 01 2025
Daleville, AL
Bid Date: Apr 01 2025
Daleville, AL
Bid Date: Oct 23 2024
Daleville, AL
Bid Date: Apr 16 2020
Daleville, AL
Bid Date: Oct 24 2019
Daleville, AL
Bid Date: Jul 12 2018
Daleville, AL
Bid Date: Feb 23 2021
Daleville, AL
Bid Date: Apr 15 2021
Daleville, AL
Bid Date: Jan 13 2022
Daleville, AL
Bid Date: Sep 07 2023
Daleville, AL
Bid Date: Oct 10 2023
Daleville, AL
Bid Date: Jan 27 2023
Daleville, AL
Bid Date: Mar 25 2022
Daleville, AL
Bid Date: Jul 15 2022
Daleville, AL
Bid Date: Jan 28 2022
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
