BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 31, 2025 at 8:00 PM

Updated August 1, 2025

Renovation of a transportation facility in Oklahoma City, Oklahoma. Completed plans call for the renovation of a transportation facility.

Reference Number 0000389518 For this project, Contractor must be Pre-qualified as listed by the Pre-qualification Review Board under the provisions of Ordinance No. 26,614 approved by City Council on December 8, 2020. The Pre-qualification area/s acceptable for this project are as follows: Roofing contractor "A". Question Deadline 07/16/2025 at 12:00 PM CT Questions are submitted online Yes Bonding Requirements - Bid Bond 5 % A cashiers check, certified check, irrevocable letter of credit, or surety bond payable to the OKLAHOMA CITY AIRPORT TRUST in the amount of five percent (5%) of the total bid shall accompany the bid of each Bidder. Bid Security will be returned to unsuccessful Bidders. The Bidder shall forfeit its bid security in the amount of five percent (5%) of the bid amount for failure to deliver to the Oklahoma City Airport Trust a properly executed agreement, bonds, and certificate(s) of insurance within ten (10) days of written notification of the Award of Contract to Bidder. The Oklahoma City Airport Trust reserves the right to reject any and all bids and to waive any and all informalities. It is the intent of these plans and specifications to prescribe a complete work or improvement, which the Contractor undertakes to do in full compliance with the plans, specifications, special provisions, proposal and contract. The Contractor shall do all work as provided in the plans, special provisions, specifications, proposal and contract, and shall do such additional, extra and incidental work as may be considered necessary to complete the work in a satisfactory and acceptable manner. He shall furnish all labor, materials, tools, equipment and incidentals necessary to the prosecution of the work, unless otherwise specified. The mechanical and electrical drawings, when applicable to the project, are diagrammatical. Anything shown on the architectural drawings and not shown on the mechanical or electrical drawings, or shown on the mechanical or electrical drawings and not shown on the architectural drawings, shall be interpreted as being shown on all three. The Contractor shall examine all drawings prior to bidding, and shall require his various subcontractors and materials suppliers to provide items of work shown on any of the plans and to provide necessary utility connections. The Architect-Engineer shall decide the meaning and intent of any portion of the specifications, and of any plans or drawings where same may be found obscure or be in dispute.

Bid Results

Transportation Terminals

$2,600,000.00

Public - City

Renovation

17

13

5

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
113
Active Projects
25
Bidding Soon
772
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 30, 2025

August 29, 2025

Project location map

6500 S MacArthur Blvd, Oklahoma City, OK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.